V.
OPERATING INFORMATION
Quick Fill
To fill the solution tanks, make sure the tank shutoff valve
(fig. 5.35) under the tank and the electric valve (fig. 5.36,
item1),you want to fill is open (you may fill both at the same
time). Open the valve on the quick fill attachment (fig. 5.36,
item2).
Connect your solution supply and fill to the desired level (fig.
5.37). When done, close the quick fill valve.
45
FIG 5.37
FIG 5.35
FIG 5.36
1
2
Summary of Contents for DTS 8 HI-TRACTOR
Page 27: ...NOTES 24 24 ...
Page 115: ...112 X TROUBLE SHOOTING NOTES ...
Page 120: ...117 NOTES NOTES ...
Page 121: ...118 ...