Accessories
Technical changes reserved
71
Step
Action
5
Snap second enclosure from the side over fixing plates [34]
6
Screw them from the inside with M6 screws [34]
7
Ppt insulation caps above all M6 screw heads [34]
8
Fix second enclosure at the wall with both hands free (USP)
Horizontal association (both enclosures on table):
Vertical association (both enclosures on table):
-> Same process as related above plus following step:
-
Reinforce stability of assembly by 4x screwing top/bottom plastic parts with metallic back panel
with 4 small screws delivered-by