732.28.920
HDE 17.03.21
33/52
8.1.6.
The preparation of the steps and stair stringer
elements is now completed. In the following, the appli-
cation of the Bessey one-handed clamp is explained in
more detail.
To prepare the clamp, take the one-handed clamp and
place the single component (upper part) on the rail so
that the jaws are facing each other (see photo)
Turn the red lock of the upper part to the closed lock
symbol to lock the clamp.
By operating the release lever integrated in the handle,
the sliding arm can be moved along the rail. The clamp
is now set for clamping. The clamp can now be clam
-
ped by operating the pump lever.
By repositioning the upper part, the clamp can also be
changed to spread setting. To do this, release the lock
and place the upper part on the other side of the rail
so that the jaws point in opposite directions. Then lock
the clamp again by turning the wheel.
The clamp can now be spread by operating the pump
lever.
8.1.7.
Form two equally large stacks from the stair stringer
elements. Place the last, additional component (from
the accessory pack) on one of these stacks. The stack
with the additional component becomes the later outer
stair stringer, the smaller stack the inner stair stringer.
You can put the „outer stair stringer stack“ aside for the
time being.
Inner stair stringer
outer stair stringer
en
Summary of Contents for 819.50.810
Page 25: ...732 28 920 HDE 17 03 21 25 25 de ...
Page 49: ...732 28 920 HDE 17 03 21 49 52 en ...
Page 50: ...732 28 920 HDE 17 03 21 50 52 ...
Page 51: ...732 28 920 HDE 17 03 21 51 52 ...