9-2
Microprocessor
P/N 108755-US, Manual revision: AA
B
ODY
B
OARD
R
EPLACEMENT
Warning: With the removal of the Body Board and Power Supply PCBA's from
the base, AC and DC voltages are exposed, use CAUTION when handling these
assemblies.
Caution:
Always wear an ESD strap when working on the Shaker.
1.
Remove body board and power supply from the base of the Shaker (see
Chapter 5, Body Board Strain Gauge Amp Adjustment Procedure on page
5-7).
2.
Disconnect all plug connectors from Body Board.
3.
Remove the four mounting screws and install the new Body Board.
4.
Attach the extender harness.
5.
Apply power to Shaker. Adjust R3 and R7 (see Chapter 5, Body Board
Strain Gauge Amp Adjustment Procedure on page 5-7).
6.
Verify all settings (see below).
7.
After installing a new body board, the unit must be programmed using the
instructions in Program setting "F1" on page 9-3 and Clock/Calendar Ini-
tialization on page 9-7.
Summary of Contents for SEBRA 1040
Page 1: ...108755 US service manual Model 1040 Digital Blood Shaker...
Page 3: ......
Page 4: ...Printed in USA Copyright 1999 2010 Haemonetics Corporation...
Page 8: ...vi Preface P N 108755 US Manual revision AA...
Page 12: ...x Table of Contents P N 108755 US Manual revision AA...
Page 14: ...xii List of Figures P N 108755 US Manual revision AA...
Page 20: ...1 6 Introduction P N 108755 US Manual revision AA...
Page 36: ...3 10 Inspection Procedures P N 108755 US Manual revision AA...
Page 40: ...4 4 Parts Access P N 108755 US Manual revision AA...
Page 48: ...5 8 Strain Gauge P N 108755 US Manual revision AA...
Page 60: ...7 6 Tube Clamp Assembly P N 108755 US Manual revision AA...
Page 64: ...8 4 PCB Chassis Assembly Installation P N 108755 US Manual revision AA...
Page 86: ...11 4 Clamp Body Boss Replacement P N 108755 US Manual revision AA...
Page 98: ...13 8 Cap Assembly P N 108755 US Manual revision AA...
Page 102: ...14 4 Power Supply P N 108755 US Manual revision AA...
Page 105: ......