![HADEF 62/05 S Installation, Operating And Maintenance Instructions For The Installer And The User Download Page 14](http://html1.mh-extra.com/html/hadef/62-05-s/62-05-s_installation-operating-and-maintenance-instructions-for-the-installer-and-the-user_3206777014.webp)
14
5.52.420.00.01.09
9.2
Power supply
9.2.1
Mains connection
Hoist motor technical data can be found it in the "Technical data" chapter.
The following tables show the assignment of the fuses.
Select connection cross-sections as per VDE 0100.
Put sleeves on the ends of the cables.
Insert the connection cable into the connection plug without strain.
Secure lines as per VDE 0100.
9.2.2
Control line connection
Pendant with cable and plug-in connection. Plug-in before use.
Any changes of the power supply cable must only be effected by qualified personnel.
9.2.3
Power connection of the brake
The low-maintenance D.C. spring-pressure brakes are connected at the factory according to the wiring
diagram.
9.2.4
Wiring diagram
Wiring diagrams are situated in the terminal box or can be requested from HADEF by metioning of serial
number.
9.2.5
Assignment recommendation of line cross-sections and fuses
Assignment of line cross-sections and fuses must be done acc. to VDE0100.
For total motor output add all motor output data. The technical data of the motors are found in chapter
„Technical Data“ resp.on the motor name plates.
Motor output
up to
kW
Fuse
Slow-blow
A
Start up-/
Nominal current
Ia / In
Line cross section (mm²) for line length L (m)
L < 50
50 < L < 100
100 < L < 150
1,1
10
3-7- times
1,5
2,5
4
2,2
16
4
20
2,5
4
6
5,5
35
4
10
12
50
6
10
NOTICE!
The values listed in the table refer to 400V/50 Hz three-phase current and are recommendations.
The exact determination of the supply line must be carried out on site by a specialist.
9.3
Load chain
Before commissioning the load chain must be aligned and oiled.
Move safety note and fixing wire away from the chain.
9.4
Power operated hoists with chain container:
Due to the transport and / or installation of the hoist on the beam, the position of the load chain in
the chain container can change unfavorably.