5.52.693.00.01.00 

 

 

 

4.2 

Design 

HADEF trolleys with 2 load bolts. 

 

Type 32/20R, with push travel trolley 

 

 

Type 32/20H, with hand geared trolley 

 

Type 32/20E or P, with electric or pneumatic trolley 

 

 

4.3 

Functions 

Push travel trolley: 

 

The trolley is moved by pushing the load. 

Hand geared trolley: 

 

Hand  geared  trolleys  are  moved  by  pulling  one  of  the  two 
stands of the endless hand chain. 

 

 

NOTICE!

 

The best protection against functional failures in case of extreme environmental impact is the regular use of 
the equipment. 

 

4.4 

Important components 

  Wheels 

Machined wheels with maintenance-free roller bearings. Profiled wheel surfaces for the use on all standard 
beams with inclined and parallel flanges. 

  Side plates 

Made of steel plate with integrated wheel fracture supports. 

  load bars 

Device with 2 load bolts. Different bolt lengths are available for different beam flange widths. 

  Motors 

 

Type E - Standard three-phase motor 

 

Type P - Pneumatic motor, 6 bar 

  Control 

 

Type E - control by pendant control switch for direct control or low voltage control 

 

Type P - control by precision direct control or indirect control 

 

Summary of Contents for 32/20

Page 1: ...onorail Trolley Type 32 20 as monorail push travel trolley R as monorail hand geared trolley H as monorail electric trolley E as monorail pneumatic trolley P as swivelling Trolleys Installation Operat...

Page 2: ...Contents 1 Information 3 2 Safety 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 5 2 5 Basic safety measures 5 3...

Page 3: ...claims require adherence to all instructions in this manual Before delivery all products are packed properly Check the goods after receipt for any damage caused during transport Report any damage imm...

Page 4: ...he device is only operated in a fault free fully functional condition and the safety components in particular are checked regularly to ensure that it is functioning properly The required personal prot...

Page 5: ...ndication label in reactor containment vessels to transport people The device is not suitable for use on stages and in studios Persons must not stand under a suspended load NOTICE If the units are not...

Page 6: ...o not throw or drop the equipment Use adequate means of transport Transport and means of transport must be suitable for the local conditions 3 2 Safety device for transport NOTICE Should a safety devi...

Page 7: ...treme environmental impact is the regular use of the equipment 4 4 Important components Wheels Machined wheels with maintenance free roller bearings Profiled wheel surfaces for the use on all standard...

Page 8: ...type leave a distance for the load hook It is important that the load hangs in the middle under the beam so that the two side plates are equally loaded The suspension eye 9 if existent for bigger load...

Page 9: ...to adjust the beam flange width dismantle the safety screws 3 at one trolley side After adjustment of dimension X and installation on the beam install the safety screws 3 again and secure them with a...

Page 10: ...nd chain Control buttons Control symbols shown are for optical information only and can vary depending on the control module Emergency stop Illustration 3 Arrow keys drive left right Illustration 4 Sy...

Page 11: ...000 kg capacity and without motor driven trolleys of hoisting unit must be tested by a qualified person before putting into operation for the first time Hoists of 1000 kg capacity and up or with more...

Page 12: ...and check the positions of the end stops 12 Maintenance 12 1 General All monitoring servicing and maintenance operations are to ensure correct functioning of the equipment they must be effected with u...

Page 13: ...crews 8 from the magnetic body clockwise 5 Tighten the locking screws 6 6 Check the air gap again and re adjust if necessary Illustration 10 13 Inspection 13 1 Periodic checks Independently from the r...

Page 14: ...the oiler of the maintenance unit Recommendation Should longer periods of standstill be foreseen insert some cm of oil into the air supply hose after the last use of the unit and let the motor run sho...

Page 15: ...be changed completely If the unit is suitable for explosive atmospheres the motor must be returned to the manufacturer for repair Air gap is too large Re adjust the air gap If the unit is suitable fo...

Page 16: ...rried out in accordance with environmental regulations 18 Additional documents 18 1 Electric wiring diagrams Electric wiring diagrams are attached to the consignment or included in the terminal box Ex...

Reviews: