10
5.52.693.00.01.00
7
Control
Only people that are familiar with the operation of the lifting devices and cranes may be entrusted with their
operation. They must be authorized by the employer for the operation of the equipment. The employer must
ensure that the operating instructions are available near the equipment and that they are accessible for the
operating personnel.
Monorail push travel trolleys are moved by pushing the load.
Monorail hand geared trolleys are moved by pulling the hand chain.
Control buttons
Control symbols shown are for optical information only and can vary depending on the control module.
Emergency stop
Illustration 3
Arrow keys = drive left / right
Illustration 4
System start (optional)
Illustration 5
Push button functions (E)
Relieved push button = stand still
push button half pushed = slow speed
push button pushed completely = fast speed
Illustration 6
Push button functions (P)
Relieved push button = stand still
push button pushed = respective movement
Illustration 7
Red Emergency-Stop button
button pushed = stand still
turn the button clockwise = free functions
Illustration 8
NOTICE!
Lockable Emergency-Stop buttons must first be opened with the key before unlocking!