5.52.131.00.01.09
13
6.5
Chain container installation
The chain container is supplied as a complete
unit. For the installation of the chain container, the
following must be observed:
Mount chain container (1) with screws (2) in
the position provided (3).
Let the load chain run smoothly into the chain
container (1).
The holding chain (4) which is already fixed to
the chain container must be fastened with
screw (6) at the position provided therefore at
the hoist (5) in such a way that the chain
container (1) hangs as horizontally as possible,
to achieve this, either shorten the holding chain
(4) or another chain link must be added to the
holding chain (4).
Re-check the fastening screws.
Check whether the load chain of the device
can enter the chain container freely by carrying
out a functional test without load.
Illustration 5
i The chain container should hang horizontally or
as horizontally as possible
1 chain
container
2 screws
3 position for screws
4 holding
chain
5 position of holding chain
6 screw
6.6 Tools
7 Operation
Only people that are familiar with the operation of the lifting devices and cranes may be entrusted with their
operation. They must be authorized by the employer for the operation of the equipment. The employer must
ensure that the operating instructions are available near the equipment and that they are accessible for the
operating personnel.
The shown control switches are only for the optical information. They can be different acc. the delivery.
Capacity Size
Tool
Use
0,5t
1t
1,5t + 2t
2,5t + 3,2t + 4,0t
5t + 6,3t
7,5t + 10t
SW27
SW36
SW46
SW55
SW60
SW75
Load bar
12,5t
16t – 60t
SW22
SW24
Load bar
with fixing ring
only if pneumatic
drive exist
div.
Pneumatic connections
div.