03.
ASSEMBLING AND CONNECTING THE BOW LIGHT
Fit the support
19-06
on to the top of the
jackstaff
19-09
and slide it down the pole.
Turn the deck assembly
1-01
over and guide the
fibre optic cable
19-10
through the hole in the
bow. Have the jackstaff support
19-06
ready.
Fix the two legs of support
19-06
into the recesses of
the upper deck. Adjust the jackstaff so that the knot
of the fibre optic cable is at the front (see arrow).
Put a drop of superglue on each of the two feet
of the support
19-06
as indicated by the arrows.
Glue the mount
19-05
in the recess on the
underside of the upper deck
1-01
near the bow,
as shown.
Noting the orientation, thread the the fibre optic
cable
19-10
through the fibre optic cable mount
19-05
. Put a tiny drop of glue on the pin of the
mount.
1-01
19-10
19-06
19-06
19-09
19-06
19-06
19-05
19-10
19-05
1-01
01
02
03
04
05
06
38
38
AGORA
MODELS
39
AGORA
MODELS