1.

The key to stability, functionality and endurance is a good foundation for your summer house. Only

ensure a perfect fit for the timbers, the door and

the window while guaranteeing stability.

In the general drawing you will find the dimensions of your cabin to allow you to

prepare your footings - the 7 pedestal beams for the cabin (3.00 m in length) are laid

See

absolutely level, strong footings (for the veranda as well)

Flagstones or paving bricks on top of a (frost-free) bed of gravel are suitable, but frost-resisting
concrete (either over the whole area or in the form of piers) is also ideal as a base for the floor-joists (and
is also good for ventilation).

lengthwise.

diagram

2.

Pre-sorting

2.

4

Pre-sorting - you don't need to worry about the number of parts when you open the package -

Please refer to

for assistance. This shows all the parts belonging to the 4 walls and gives you a guide

to assembling the entire structure. The references on the drawing allow you to compare them with the list of
parts and allocate the parts according to their dimensions - all the parts are listed here once more, together with
their approximate measurements.

everything

becomes much easier once you have sorted the pieces into their appropriate categories!

diagram 1

Important!

Please check the content of the package with the part list and contact your dealer if something is

missing or can not be used for the purpose.

2.

Luzern

271205

Summary of Contents for Luzern 727

Page 1: ...spruce wall boards Dimensions of pedestal Outer dimensions incl roof overhang Area of roof Height of ridge 1 glazed door width x height 2 glazed windows width x height Height of side walls All measure...

Page 2: ...tor is recommended or paint please take notice of the recommendations of the varnish or paint manufacturer It is not advisable to paint the wall timbers before assembling them this is best done when t...

Page 3: ...3 1 Side walls C Rear wall B Front wall A Luzern 271205...

Page 4: ...base forthe floor joists and is also good forventilation lengthwise diagram 2 Pre sorting 2 4 Pre sorting you don t need to worry about the number of parts when you open the package Please refer to fo...

Page 5: ...ere in the assembly process To avoid damage we have enclosed wooden blocks marked with an X to be placed on the planks for protection purposes the ends of the timbers protruding at the corners require...

Page 6: ...nt for a log cabin structure your summer house will settle up to 3 4 cm during the course of the different seasons and varying weather conditions To allow for this there has to be some otherwise the h...

Page 7: ...dunderextremeweatherconditions andadjustingthemas required This should be done by adjusting the whole frame using gentle taps of the rubber mallet please use wooden blocksinbetween or by tighteningor...

Page 8: ...ve upwards Attachthefasciaboards C4 flush withtheroof Thenthework canbeginon theroofingshingles Here again any unevenness caused by the planer rough edges etc even in the grooves and tongues are due t...

Page 9: ...ling of the first row of shingles position the next row in alignment with the previous row the next row must also cover the nails of the previous row Continue installation in accordance with Pic B Cut...

Page 10: ...ing enclosed bolts with the nuts facing inwards It is important not to tighten the top nuts too firmly toallowthestructureroomto settle screw thestrips down firmlyusing theremainingbolts Please take c...

Page 11: ...n when removing and replacing the window cross since it is a tightfit Regular visual checks help to avoid damage before it occurs Please remember that fitting adjustments to the differentpartsareanuna...

Page 12: ...List of parts 10 12 Luzern 271205...

Reviews: