74
during transport. The tubular frames not designed to endure any pull.
Always fasten the rope pulling machine to the anchor bolt.
To insert the rope: Insert the rope loop from left into the tubular frame, and place
the rope into the driving wheel as shown in the drawing.
Guide the rope end with load hook behind the vertical and underneath the
horizontal rope pulley.
Guide the slack end of the rope over the horizontal rope pulley.
9.3
Variable speed
A frequency converter can be installed to vary the rope speed between 2 and 10 m/min. In
this case the tubular frame is needed.
9.4
Faster speed
For loads up to 10 kN the pulley machine can be equipped with other gear ratio for rope
speed 17 m/min.
9.5
Other pulling forces
For other pulling forces, we have rope pulling machines for 8, 32 and 64 kN.
9.6
Control box guard
For heavy duty the control box can be protected with a guard.
8
Disposals
Please observe the regulations regarding disposal that are effective in the respective
country.
Empty all oil from your
HIT-TRAC
machine.
Make sure that even very small amounts of oil are disposed of properly or take them to
companies or authorities responsible for proper disposal.
When dismantling the machine, separate materials according to type for recycling
purposes.
Keep metal and plastic parts separate from one another or take them in for recycling.
Please bear in mind that protecting the environment and recycling materials benefits all of
us.
Summary of Contents for HIT-TRAC 16 E
Page 18: ...18 4 1 Elektrisch schema nr 900 00022 ...
Page 21: ...21 Eindschakelaar hijsen Geleidingsrol Aandrijfwiel ...
Page 42: ...42 4 1 Schéma électrique de connexions no 900 00022 ...
Page 66: ...66 4 1 Electrical circuit diagram 900 00022 ...
Page 75: ...75 ...
Page 77: ...77 07521 00807 07522 07513 080 411 001 07503 8 07503 11 Ø 8 2 07180 Ø 11 2 07181 07456 ...
Page 79: ...79 07576 080 911 001 07482 07525 07524 07527 07240 07242 ...