
6
Figure 196 Verifying the configuration
9.
To revise the settings, click
Previous
. If no revision is required, click
Next
.
10.
After you click
Next
on the
Verify configuration
page, iFIST starts to prepare the server for the
OS installation and displays the real-time progress, as shown in
After the preparation is complete, iFIST reboots the server and installs the OS.
Figure 197 Preparing the server for OS installation