background image

 

Model 

Chassis dimensions 

Rack requirements 

chassis front 

 

30 mm (1.18 in) for the ejector 
levers of the fan tray at the 
chassis rear 

M9000-AI-E16 

 

Height

—841.7 mm (33.14 in) 

 

Width

—440 mm (17.32 in) 

 

Depth

—735 mm (28.94 in) 

 

640 mm (25.20 in) for the 
chassis 

 

95 mm (3.74 in) for the cable 
management brackets at the 
chassis front 

 

12 mm (0.47 in) for the 
captive screw of the fan tray 
at the chassis rear

 

 

Figure 1 Rack dimensions 

 

 

Cooling 

The gateway uses front-to-rear airflow for heat dissipation. Plan the installation site for the gateway 
based on its airflow direction for adequate ventilation. Make sure the following requirements are met: 

 

The installation site has a good cooling system. 

 

The rack for the gateway has a good cooling system. 

 

Leave a minimum clearance of 300 mm (11.81 in) around the inlet and outlet air vents. 

Rack

Rear door

Chassis

Front door

Front rack post

≥ 140 mm 

(5.51 in)

≥ 950 mm 

(37.40 in)

Summary of Contents for SecPath M9000-AI-E8

Page 1: ...tions 1 Electricity safety 1 Handling safety 1 ESD prevention 1 Laser safety 2 Examining the installation site 2 Weight support 2 Space 2 Cooling 3 Power 4 Lightning protection 5 Temperature 5 Humidit...

Page 2: ...ngrounded power extension cables missing safety grounds and wet floors Locate the emergency power off switch in the room before installation so you can quickly shut power off when an electrical accide...

Page 3: ...sure the floor can support the total weight of the rack chassis and accessories Additionally the floor loading plan must also consider system expansion such as adding more modules For more information...

Page 4: ...e screw of the fan tray at the chassis rear Figure 1 Rack dimensions Cooling The gateway uses front to rear airflow for heat dissipation Plan the installation site for the gateway based on its airflow...

Page 5: ...t voltage is stable and within the acceptable range allowed by the gateway Enough batteries are available to ensure uninterrupted device operation in the event of a power failure For the power supply...

Page 6: ...to a high temperature environment dry the chassis before powering it on to avoid short circuits If the temperature in the equipment room is too high too low or changes dramatically the device reliabi...

Page 7: ...ents as shown in Table 5 Table 5 Harmful gas limits in an equipment room Gas Max mg m 3 SO2 1 0 H2S 0 5 NH3 3 0 Cl2 0 3 NO2 1 0 EMI Electromagnetic interference EMI might be coupled from the source to...

Page 8: ...ies Pre installation checklist Table 6 Pre installation checklist Item Requirements Result Installation site Load bearing The floor or ground at the installation site can support the sum of the weight...

Page 9: ...rotective earthing systems of the communication power supplies use the same earthing conductor set with the protective earthing system of the communication devices Temperature 0 C to 45 C 32 F to 113...