Preparing for installation 

H3C SecPath  M9000-AI multiservice security gateways  include the M9000-AI-E8 gateway and 
M9000-AI-E16 gateway. 

Safety recommendations 

To avoid bodily injury and equipment damage, read all  safety recommendations carefully before 
installation. Note that the recommendations do not cover every possible hazardous condition. 

General safety recommendations 

 

Keep the gateway clean and dust-free. 

 

Do not place the gateway on a moist area, and avoid liquid flowing into the gateway. 

 

Make sure the ground is dry and flat and anti-slip measures are in place. 

 

Keep the gateway and installation tools away from walk areas. 

 

Do not wear loose clothing, jewelry (for example, necklace) or any other things that could get 
caught in the chassis when you install and maintain the gateway. 

Electricity safety 

 

Clear the work area of possible electricity hazards, such as ungrounded power extension 
cables, missing safety grounds, and wet floors. 

 

Locate the emergency power-off switch in the room before installation so you can quickly shut 
power off when an electrical accident occurs. 

 

Unplug all external cables, including power cords, before moving the chassis. 

 

Do not work alone when the gateway has power. 

 

Always verify that power has been disconnected from a circuit. 

Handling safety 

When you move the gateway, follow these guidelines: 

 

Remove all external cables, including the power cords, before moving the chassis. 

 

As a best practice, use a mechanical lift to move the chassis. To move the chassis manually, 
use multiple people. 

 

Lift and put down the chassis slowly and never move suddenly. 

 

Hold the handles of the chassis. 

ESD prevention 

To prevent the electric component from being damaged by electrostatic discharge (ESD), follow 
these guidelines: 

 

Ground the gateway correctly. 

 

Always wear an ESD wrist strap and make sure it is correctly grounded when installing FRUs. 

 

Hold a PCB by its edges. Do not touch any electronic components or printed circuit. 

Summary of Contents for SecPath M9000-AI-E8

Page 1: ...tions 1 Electricity safety 1 Handling safety 1 ESD prevention 1 Laser safety 2 Examining the installation site 2 Weight support 2 Space 2 Cooling 3 Power 4 Lightning protection 5 Temperature 5 Humidit...

Page 2: ...ngrounded power extension cables missing safety grounds and wet floors Locate the emergency power off switch in the room before installation so you can quickly shut power off when an electrical accide...

Page 3: ...sure the floor can support the total weight of the rack chassis and accessories Additionally the floor loading plan must also consider system expansion such as adding more modules For more information...

Page 4: ...e screw of the fan tray at the chassis rear Figure 1 Rack dimensions Cooling The gateway uses front to rear airflow for heat dissipation Plan the installation site for the gateway based on its airflow...

Page 5: ...t voltage is stable and within the acceptable range allowed by the gateway Enough batteries are available to ensure uninterrupted device operation in the event of a power failure For the power supply...

Page 6: ...to a high temperature environment dry the chassis before powering it on to avoid short circuits If the temperature in the equipment room is too high too low or changes dramatically the device reliabi...

Page 7: ...ents as shown in Table 5 Table 5 Harmful gas limits in an equipment room Gas Max mg m 3 SO2 1 0 H2S 0 5 NH3 3 0 Cl2 0 3 NO2 1 0 EMI Electromagnetic interference EMI might be coupled from the source to...

Page 8: ...ies Pre installation checklist Table 6 Pre installation checklist Item Requirements Result Installation site Load bearing The floor or ground at the installation site can support the sum of the weight...

Page 9: ...rotective earthing systems of the communication power supplies use the same earthing conductor set with the protective earthing system of the communication devices Temperature 0 C to 45 C 32 F to 113...