i
Contents
Preparing for installation ···································································· 1
Installing the switch ·········································································· 4
Installing a PSR360-56A/PSR560-56D/PSR720-56A/PSR1110-56A power module ························· 20
Removing a PSR360-56A/PSR560-56D/PSR720-56A/ PSR1110-56A power module ······················ 22
Accessing the switch for the first time ················································· 32
Setting up an IRF fabric ··································································· 37