Platform installation
Proper drainage must be provided for any outdoor installation of the
platform ramp.
Never allow the platform to sit in a puddle of water.
The platform’s contact surface must be 100% perpendicular to the vertical
wall, or the mounted gate.
The base must be firm and stable, e.g. concrete, paving stones, strong timber
or asphalt. Sand, gravel or earth CANNOT be used.
The platform must not only be supported at different points; there must be
support under ALL of the platform’s base frame.
Attach the platform to the base through holes in the fittings by the scissors.
One fitting to each side of the platform.
You can order either a right or
left-hinged gate and it will always
swing away from the platform.
Right/left-hinging can be changed
on site if necessary.
Mount the gate on the vertical
wall, between the platform and
upper level. Fixing points in
compliance with the dimensio
-
ned sketch. (1)
Mount pos. 1 on gate so that it
is flush with the top edge of the
landing.
The accompanying board must
be mounted to the gate to pre-
vent fingers and feet being crushed between the gate and the platform.
Use the accompanying rustproof metal sheet as finish between the landing
and the gate.
Hook up electrical connection of the gate, external service panels and wire
-
less remote control in a connection box under the platform.
Adjusting the lifting height of the LP5
Remove the black curtain.
A: Adjusting the lifting height.
B: Adjusting the lowering height (seldom used - e.g. in case of recessing).
A: Adjusting the lifting height
Loosen the screws and adjust to desired height.
Check the new lifting height before remounting
the curtain.
B: Adjusting the lowering height
Recessing
Loosen the screws and adjust to
desired height.
Check the new lifting height before
remounting the curtain.