6
5
1
6
2
4
3
2
©
Guldmann
G
B
/U
S
-1
51
5/
08
/0
9
•
#
550536
©
Guldmann
G
B
/U
S
-1
51
5/
08
/0
9
•
#
550536
1 .07 .
Installing .Pontus .– .single .rail .system
Installing .the .system
Support the B-rail (pos. 1) so the end
stops (pos. ) and the trolley/hoist
(pos. 3) can be placed in the rail.
Positioning the trolley/hoist in the
middle of the rail by means of the
end stops.
The rubber tips of the end stops
should be facing towards the trolley.
Push the B-rail towards the bottom
of the top bracket on the post so
the mounting plate (pos. 5) slides
into the upper track of the B-rail.
Tighten the M10 locking nuts (pos.6)
to a torque of 40 Nm with a 17 mm
wrench.
Follow the same procedure for the other top bracket.
Use a “Lasy boy” support if necessary.
Loosen the end stops and tighten these as close to the
top bracket as required.
Insert the connector at an angle (approximately 7-1°) in the end of the rail
(between the topbracket and endstop), and fix this into place by tightening the
pointed screw through the track opening of the rail so the pins are pressed
against the copper tracks at the bottom of the rail.
1 .08 .
Installing .Pontus .– .room-covering .rail .system
Guldmann recommends that the Pontus room-covering rail system is installed
and taken down by two qualified installers.
Mounting .aids:
Use two “Lasy boys” supports when installing the Pontus room-covering rail
system.
Make sure that the floor is protected with thick cardboard or a cloth while set-
ting up the room-covering rail system.
Premounting .the .legs:
All support posts are fitted with plastic endcaps (pos. 3, page 7).