![GTO GP-SL100 Owner'S Manual Download Page 15](http://html1.mh-extra.com/html/gto/gp-sl100/gp-sl100_owners-manual_2276267015.webp)
12
Allen Bolts
with 5mm key
Washers
Mounting the Operator
1.
Lift the operator and align its mounting holes over the 3/8” diameter concrete mounting anchors.
2.
Lower the operator into position and fasten it to the mounting anchors with (4) 3/8” washers and
nuts (not provided).
1.
Turn the breaker power switch off before connecting AC power. Have a licensed electrician
run 115 Vac wiring into the Field Wiring Connection Compartment. The 115 Vac line will power
the gate operator system. The circuit must be protected with a 15 A main disconnect breaker
(not provided).
NOTE:
Power and wiring connections MUST be
performed by a licensed electrician in accordance
with NEC (National Electric Code) and local codes.
NEVER
run low voltage (e.g., accessory or receiver)
wires in conduit containing 115 Vac wiring.
Removing the Operator Housing
Before you can gain access to the operator frame and its mounting holes, the housing will have to be
removed from the operator.
1.
Remove the (2) 3/8” allen bolts and (2) m8 washers from the operator housing (this hardware is
located on each side of the housing).
2.
Lift the housing off the operator and set it aside.
Connecting Power to the Operator