13
Push the cover back to it’s original position to
cover the wires and connections from water
ingress.
Making sure the power is switched off at the
socket, screw the two charging rods into the
holes just below the cover of the base station.
Note: This is where the LED status indicator is
situated. See page 24.
LED status indicator
Once the base station has been fully wired it
can be secured in place with the four screws
provided. Use the allen key provided to
screw them in securely ensuring they are
fully inserted and flush with the station base.
Protruding screws can hinder the mower from
locating correctly.
Then screw on the outer ring to secure the
cable in place and prevent water ingress.
4719_Robot_Mower_manual_aw3.indd 13
4719_Robot_Mower_manual_aw3.indd 13
20/04/2021 16:22
20/04/2021 16:22