1.6.1 Cable Connections 

Note 

The  operations  described  in  this  section  must  be  performed  by  authorized  electricians  or  qualified 

technical personnel. If you have any difficulties, do not hesitate to contact our Customer Service & Support 

department. 

 

After  the  equipment  has  been  finally  positioned  and  secured,  refer  to  Chapter  4  Installation  Drawing  to 

connect the power cables as described in the following procedures: 

1.  Verify  that  all  the  external  input  distribution  switches  of  the  UPS  are  completely  opened  and  the  UPS 

internal maintenance bypass switch is opened. Attach necessary warning signs to these switches to prevent 

unauthorized operation. 

2. Open rear panel of the UPS, and then the power connection terminals are accessible.   

3. Connect the protective earth and any necessary grounding cables to the PE terminal. The cabinet for the 
UPS must be connected to the user’s ground connection. 

Note: 

The grounding cable and neutral cable must be connected in accordance with local and national codes 

practice. 

 

Identify  and  make  power  connections  for  incoming  cables  according  to  one  of  the  two  procedures  below, 

depending on the type of installation: 

 

Common Input Connections 

 

4. For common bypass and rectifier inputs, connect the AC input supply cables to the UPS bypass terminals 

(X2/L21-L22-L23 X1/N1) Refer to 

Fig. 4-11

 and tighten the connections to 5 Nm (M6 Bolt), 13Nm (M8 Bolt) or 

25Nm (M10 Bolt). Do not remove copper bridge between X1 and X2 terminals. 

ENSURE CORRECT PHASE ROTATION AND TIGHTEN CONNECTION TERMINALS 

 

Split Bypass Connections 

 

5.  If  a  'split-bypass'  configuration  is  used,  ensure  that  the  common  copper  bridges  between  Bypass  and 

Rectifier inputs are removed.   

Note: DO NOT REMOVE THE NEUTRAL COPPER BRIDGE   

Connect the AC input supply cables to the rectifier input terminals (X1/L1-L2-L3-N1) Refer to 

Fig.4-11

 and the 

AC bypass supply cables to the bypass input terminals (X2/L21-L22-L23) and tighten the connections to 5 

Nm (M6 Bolt) or 13Nm (M8 Bolt) or 25Nm (M10 Bolt).   

Note: ENSURE CORRECT PHASE ROTATION AND TIGHTEN CONNECTION TERMINALS 

 

Frequency Converter Mode 

 

If the frequency converter configuration is used,  connect the AC input cables to the rectifier input terminals 

(X1/L1-L2-L3-N1) Refer to 

Fig.4-11

 and tighten the connections to 5Nm (M6 bolt), or to 13Nm (M8 bolt), or to 

25Nm (M10 bolt).   

Note: ENSURE CORRECT PHASE ROTATION AND TIGHTEN CONNECTION TERMINALS

.   

No  need  to  connect  the  bypass  input  cables  to  bypass  input  terminals  in  case  of  dual  input  version  and 

ensure to remove copper bridge in phases terminals. Leave the neutral copper bridge installed. 

 

 

 

警告

  

危 险

   

Summary of Contents for MUST400T

Page 1: ...Quick Start Modular UPS MUST400T...

Page 2: ...urer approved accessories only WARNING high earth leakage current Earth connection is critical before connecting the input supply include both utility supply and battery Earth leakage current introduc...

Page 3: ...mal manner following the recommended operating procedures in this manual Battery voltage higher than 400Vdc All the battery maintenance and servicing procedures involving internal access need special...

Page 4: ...xceed 400Vdc and is potentially lethal Follow the suggested actions here below Eye protection must be worn to prevent injury from accidental electrical arcs Remove rings watches and all metal objects...

Page 5: ...re will reduce the battery life and operation below this temperature will reduce the battery capacity If the average operating temperature of battery is increased from 20 C to 30 C then the service li...

Page 6: ...20 C to 25 C The batteries are at maximum efficiency in this temperature range for information about the battery storage and transportation as well as the environment refer to Table 9 2 This equipmen...

Page 7: ...power terminals inside the UPS and all service activity it is recommended to leave enough free space to enable the passage of personnel with the doors fully opened It is important to leave a distance...

Page 8: ...Quick start_MUST400T_ENG_REV00 8 a 10 module cabinet b 6 module cabinet Fig 1 1 UPS Structure...

Page 9: ...xing holes on both sides of the front panel of the module See fig 1 2 Fig 1 2 Power Module Installation Diagram 1 4 9 Cable Entry Cables can enter into the UPS system both from bottom and top Cable en...

Page 10: ...e RCD device installed upstream of the input supply should be comply with Sensitive to DC unidirectional pulses class A in the network Insensitive to transient current pulses Have an average sensitivi...

Page 11: ...ermining the size of the output and bypass neutral cable as the current circulating on the neutral cable may be greater than nominal current in the case of non linear loads which is usually 1 732 time...

Page 12: ...ut Connections 4 For common bypass and rectifier inputs connect the AC input supply cables to the UPS bypass terminals X2 L21 L22 L23 X1 N1 Refer to Fig 4 11 and tighten the connections to 5 Nm M6 Bol...

Page 13: ...d the critical load and tighten the terminals screws to 5Nm M6 Bolt or to 13Nm M8 Bolt or to 25Nm M10 Bolt Note ENSURE CORRECT PHASE ROTATION WARNING If the load equipment will not be ready to accept...

Page 14: ...an die USV abschlie en Ein Differentialschutz ist ratsam Conectar el cable de tierra a el SAE Se aconseja la protecction con el interruptor diferencial Attenzione batterie interne non aprire pericolo...

Reviews: