![GSi 21' Diameter Gamma Assembly Instructions Manual Download Page 33](http://html1.mh-extra.com/html/gsi/21-diameter-gamma/21-diameter-gamma_assembly-instructions-manual_2274962033.webp)
4. Roof Assembly
PNEG-2145
21' Diameter Gamma Roof Assembly Instructions
33
Figure 4T Installation of the First Roof Flashing Section
4. Place a strip of rope caulk (J) along the edge of the installed roof flashing (A) where the next roof
flashing will overlap.
5. Align the holes along the edge of the next roof flashing with the holes of the previously installed roof
flashing and fasten together using bolts (E) and nuts (F).
6. Repeat
with second and third roof flashing sections.
NOTE:
Remember to place caulk between the overlap of the roof flashing sections.
7. Field drill holes into the center collar (C) through the Z-collar support clips (I) and fasten together
using the bolts (G) and nuts (H).
Ref #
Part #
Description
Ref #
Part #
Description
A
CTR-0640
Roof Flashing
F
S-3611
5/16" Flange Nut
B
CTR-0381
Roof Panel
G
S-7487
3/8" x 1" Flange Bolt
C
CRP-4608
Center Collar
H
S-9426
3/8" Flange Nut
D
Align flashing and center collar holes
I
CRP-4900
Z-Collar Support Clip
E
S-10260
5/16" x 1" Flange Bolt
J
Rope Caulk