![GSi 21' Diameter Gamma Assembly Instructions Manual Download Page 29](http://html1.mh-extra.com/html/gsi/21-diameter-gamma/21-diameter-gamma_assembly-instructions-manual_2274962029.webp)
4. Roof Assembly
PNEG-2145
21' Diameter Gamma Roof Assembly Instructions
29
Attaching the Roof Panels
Roof panels overlap the previous roof panel, giving protection from outside elements. Rafters and roof
panel support clips will support to hold the roof panels.
Before You Begin
Ensure all roof rafter assemblies and purlins are installed and properly tightened. Pre-determine the
manway access location. Make sure roof panel support clips are attached on the purlins before installing
the roof panels (A).
What You Should Know
For adjustment purposes, roof panels (A) are installed to each rafter first, causing exposed gaps (B)
between each roof panel (A) group.
After all roof panels are installed, ensure that all
installed hardware (flange bolts with sealing washers and flange nuts) are tightened to secure the
roof panels.
When installing the roof panels (A), take into consideration placing the manway for ease of access to and
from the sidewall and roof ladders.
Figure 4P Roof Panel Overview
Ref #
Part #
Description
A
CTR-0381
Roof Panel
B
Exposed Gap
I
Upper Rib
J
Lower Rib