13
Flue assembly
Upper flue ;
7
Slightly widen the two sides of the upper flue
and hook them behind the brackets
(7.2.1)
,
making sure that they are well seated.
7
Secure the sides of the brackets using the 4
12c
screws (2.9 x 9.5) supplied.
7
Make sure that the extensions pieces are
aligned with the flue outlets.
Lower flue ;
7
Slightly widen the two sides of the flue and
hook them between the upper flue and the
wall, making sure that they are well seated.
7
Fix the lower part laterally to the hood body
using the 2
12c
(2.9 x 9.5) screws supplied.
Transportation
Disconnect the appliance from mains supply
and remove the hood first if you need it to be
transported. Transport the appliance with its
original package if possible, and observe the
transport markings on the original package.
If the original package is not available, pack
the appliance so that it will not be damaged.
Disposal of packaging
Package materials may be risky for children.
Keep all packaging materials away from the
children and dispose them off by classifying
them as per the waste instructions. Do not dis-
pose of with regular household waste.
Package of your product is made of recycla-
ble materials.
INSTALLATION
_____________________________________
Summary of Contents for GDK 5782 B
Page 1: ...COOKER HOOD GDK 5782 B EN ...
Page 2: ......
Page 5: ...5 ________________________________________________________ 3 4 2 1 ...
Page 20: ...FOR A GOOD REASON ...