11
Wall drilling and bracket fixing
7
Draw a vertical line on the supporting wall
up to the ceiling, or as high as practical, at
the center of the area in which the hood will
be installed.
7
Draw a horizontal line at 1040 mm above
the hob.
7
Place bracket
(7.2.1)
on the wall as shown
about 1-2 mm from the ceiling or upper limit
aligning the center (notch) with the vertical
reference line.
7
Mark the wall at the centers of the holes in
the bracket.
7
Place bracket
(7.2.1)
on the wall as shown
at X mm below the first bracket (X = height
of the upper chimney section supplied),
aligning the center (notch) with the vertical
line.
7
Mark the wall at the centers of the holes in
the bracket.
7
Mark a reference point at 116 mm from the
vertical reference as indicated.
7
Repeat this operation on the other side.
7
Drill 8 mm holes at all the center points
marked.
7
Insert plugs
(11)
into the holes.
7
Fix the lower bracket
(7.2.1)
using
12a
screws (4.2 x 44.4) supplied.
7
Fix the upper bracket
(7.2.1)
and the air
outlet connection support
(7.3)
, together
using the 2
12a
(4.2 x 44.4) screws sup-
plied.
7
Insert the two
12a
(4.2 x 44.4) screws sup-
plied in the hood body fixing holes, leaving
a gap of 5-6 mm between the wall and the
head of the screw.
Mounting the hood body
7
Before mounting the hood body, tighten the
two screws (Vr) located on the hood body
mounting points
7
Hook the hood body onto the screws
(12a)
7
Fully tighten the support screws
(12a)
.
7
Adjust the screws (Vr) to level the hood
body.
Connections
INSTALLATION
_____________________________________
Summary of Contents for GDK 5782 B
Page 1: ...COOKER HOOD GDK 5782 B EN ...
Page 2: ......
Page 5: ...5 ________________________________________________________ 3 4 2 1 ...
Page 20: ...FOR A GOOD REASON ...