Instructions
EZ Boost
TM
System
8. Set EZ Boost controller discharge PSI and verify
diaphragm pre-charge pressure.
8. Set EZ Boost controller discharge PSI
and verify diagphragm pre-charge pressure.
Diaphragm Tank
Pre-Charge
PSI
PSI
9. Switch on EZ Boost
controller.
9. Switch on power.
Green light
is on
10. Verify that BMQE pump is operating.
10. Verify that BMQE pump is operating.
Consult
Troubleshooting
Section
11. Verify that EZ Boost controller is operating.
11. Verify EZ Boost controller is operating.
These lights are on
These lights are on
12. Optional: Lock the buttons.
12. Optional: Lock the buttons.
5 seconds
5. Connect incoming power, BMQE pump, and
pressure sensor to EZ Boost controller.
PE
PE
POWER
PUMP
1
2
3 4
+24V
IN
GN
D
SENSOR
5. Connect incoming power, BMQE pump and
pressure sensor to EZ Boost controller.
1
2
3
4
6. Close EZ Boost controller cover
7. Switch on main power.
Red light
is on
6. Close EZ Boost controller cover.
7. Switch on main power.
5