Grundfos AQC-D6 Installation And Operating Instructions Manual Download Page 2

English (GB)

2

English (GB) 

Installation and operating instructions

Original installation and operating instructions

CONTENTS

Page

1. Symbols used in this document

1.

Symbols used in this document

2

2.

Device description

3

3.

General information

3

4.

Applications

3

5.

Safety

3

5.1

Obligations of the owner/operations manager

3

5.2

Avoidance of danger

3

6.

Technical data

4

6.1

General data on the AQC-D6

4

6.2

General data on the measuring module

4

6.3

Dimensional sketch / drilling diagram

5

7.

Function

6

7.1

Description of the AQC-D6

6

7.2

Design of the measuring cell

6

7.3

Function of the AQC-D6

6

7.4

Design of the measuring module

7

7.5

Functional principle of measurement module

7

8.

Installation

8

8.1

Transport and storage

8

8.2

Unpacking

8

8.3

Installation requirements

8

8.4

Installation

8

9.

Commissioning

8

9.1

Water connections

8

9.2

Electrical connections

9

9.3

Preparing the measuring system

10

9.4

Starting up the measuring system

11

9.5

Starting up the measuring module

11

9.6

Basic settings

11

9.7

Calibration

12

10.

Operation

12

10.1 Switching on

12

10.2 Operation

12

10.3 Interruptions

12

11.

Fault finding

13

12.

Maintenance

14

12.1 Functional check

14

12.2 Cleaning

14

13.

Spare parts

14

14.

Disposal

14

Warning
Prior to installation, read these installation and 
operating instructions. Installation and operation 
must comply with local regulations and accepted 
codes of good practice.

Note

These complete installation and operating 
instructions are also available on www.grundfos.com.

Warning
If these safety instructions are not observed, it may 
result in personal injury.

Caution

If these safety instructions are not observed, it may 
result in malfunction or damage to the equipment.

Note

Notes or instructions that make the job easier and 
ensure safe operation.

Summary of Contents for AQC-D6

Page 1: ...AQC D6 ClO2 measuring cell measuring module Installation and operating instructions GRUNDFOS INSTRUCTIONS...

Page 2: ...ation 8 9 Commissioning 8 9 1 Water connections 8 9 2 Electrical connections 9 9 3 Preparing the measuring system 10 9 4 Starting up the measuring system 11 9 5 Starting up the measuring module 11 9 6...

Page 3: ...s are used for measuring the concentration of chlorine dioxide in water within the scope of the potential applications described in this manual 5 Safety 5 1 Obligations of the owner operations manager...

Page 4: ...esponse time T90 30 seconds Temperature drift Temperature compensated measuring signal Permissible process water temperature 5 to 70 C Sample water flow rate Minimum 30 l h Maximum permitted pressure...

Page 5: ...3 Dimensional sketch drilling diagram Fig 3 AQC D6 Fig 4 Measuring module All dimensions in mm TM06 8111 4616 300 260 360 395 58 10 TM06 8112 4616 Height Width Depth 650 550 180 550 500 450 10 5 DN20...

Page 6: ...er The measuring cell is controlled with a potentiostat integrated in the measuring amplifier A precisely defined potential of the measuring electrode is retained through a reference system This resul...

Page 7: ...stream of sample water through the bypass It is designed specifically for compensating the internal pressure drops The extraction and feed line must therefore be kept as short as possible Sample wate...

Page 8: ...nnect hose 6 8 mm to a suitable drain Feed the fluid back to the pipework 9 1 2 Measuring module water connections The standard scope of delivery includes one PP and one PVC insertion section each for...

Page 9: ...Electrical connections may only be set up by authorised personnel Warning Switch off the power supply before connecting the power supply cable and the relay contacts Observe the local safety regulati...

Page 10: ...pos 2 Loosen the PDVF ring with 1 thread pos 1 Fit the measuring cell pos 3 in the flow fitting pos 2 1 Remove the protection cap 2 Slide the measuring cell into the flow fitting until the liquid flow...

Page 11: ...tons on the measuring amplifier in the Setup menu to select the Measuring cell line and press OK to access the corresponding menu 2 Use the Up and Down buttons to select the desired AQC D6 measuring c...

Page 12: ...calibration the regulators are switched off and the actuators closed to prevent overdosing 10 Operation 10 1 Switching on 10 2 Operation 10 3 Interruptions 10 3 1 Storage and handling when not in use...

Page 13: ...d Deposits on electrode finger Unscrew the electrolyte chamber Rinse the electrode finger dry it with a dry paper towel and carefully clean just the tip of the electrode finger with the special emery...

Page 14: ...5 Filling up with electrolyte 1 Screw the electrolyte chamber onto the measuring cell so that the socket of the electrolyte flange just fits into the gap approximately 5 mm 2 Fill electrolyte right up...

Page 15: ...namento delle legislazioni degli Stati membri UE NL EU conformiteitsverklaring Wij Grundfos verklaren geheel onder eigen verantwoordelijkheid dat de producten AQC D11 AQC D12 AQC D13 AQC D6 waarop de...

Page 16: ...16...

Page 17: ...ia S r l Via Gran Sasso 4 I 20060 Truccazzano Milano Tel 39 02 95838112 Telefax 39 02 95309290 95838461 Japan GRUNDFOS Pumps K K 1 2 3 Shin Miyakoda Kita ku Hamamatsu 431 2103 Japan Phone 81 53 428 47...

Page 18: ...splayed in this material including but not limited to Grundfos the Grundfos logo and be think innovate are registered trademarks owned by The Grundfos Group All rights reserved 2019 Grundfos Holding A...

Reviews: