9.7 Calibration

Observe the Oxiperm Pro installation and operating instructions.
1. Press the [Cal] button on the measuring amplifier of the 

Oxiperm Pro to switch to the calibration menu.

– The LED next to the [Cal] button lights up.

2. Enter the four-digit code number using the [Up] and [Down] 

buttons based on the access rights assigned for the Oxiperm 
Pro.

• The following are shown on the display for selection:

– Cal. meas. value
– Cal result
– Cal. cycle.

Calibration

1. Select the "Cal. meas. value" line, and switch to the menu of 

the same name by pressing [OK].

• Besides the input field (value in mg/l) for the analytically 

determined reference value, the actual cell current is 
displayed in µA in the lower line.

2. Use the [Up] and [Down] buttons to enter the reference value, 

and confirm using [OK].

3. Start the calibration by pressing [OK].

– The sensor data is then read automatically and the 

calibration performed. 

– The sensitivity of the sensor is calculated.

• As soon as calibration is complete, the calibration results are 

displayed (first line: "CALDATA" + measured variable):

– The sensor sensitivity is shown as µA/ppm.

Inquiring about calibration results and setting calibration 
intervals 

1. Press [OK] to switch to the calibration menu (see above).
• Once the calibration process is complete, the sensitivity of the 

electrode can be shown under "Cal results".

• A countdown function is started under "Cal cycle" which 

triggers the alarm "Calibrate sensor" after a definable time 
interval of 1-100 days.

– During calibration, the regulators are switched off and the 

actuators closed to prevent overdosing.

10. Operation

10.1 Switching on

10.2 Operation

10.3 Interruptions

10.3.1 Storage and handling when not in use for a long 

period of time

Taking the measuring module out of service in connection 
with Oxiperm Pro

The following procedure must be followed:
1. Switch off dosing of the chlorine dioxide solution (Oxiperm 

Pro).

2. Allow the measuring module to run for around two minutes.
3. Switch off the circulating pump.
4. Close the isolating valves on the measuring module.

Taking the AQC-D6 out of service

1. Switch off the power supply.
2. Switch off the sample water supply.
3. Remove the measuring cell, fill the protection cap with 

electrolyte, and screw it onto the measuring cell.

10.3.2 Starting up again

1. Clean the electrolyte chamber and electrode.
2. Fill up with electrolyte.
3. Start up the measuring system again.

ClO

2

Cal. meas. value

Cal result
Cal. cycle

Cal. meas. value

0.2 mg/l

I cell 40 µA

CALDATA ClO

2

Sensitivity
8.53 µA/ppm

Note

1. Switch on the sample water supply.
2. Start the measurement (switch on the Oxiperm 

Pro).

Note

All settings must be carried out on the Oxiperm Pro.
Observe the Oxiperm Pro installation and operating 
instructions.

Caution

Oxiperm Pro and the measuring cell must be in 
operation continuously!
The measuring cell must never be dry!

Caution

Clean the electrolyte chamber and electrode, and fill 
up with electrolyte in accordance with the 
instructions in section 

12.2 Cleaning

. Restart the unit 

in accordance with the instructions given in section 

9.4 Starting up the measuring system

. Otherwise 

there is a risk that the measuring cell will not work 
properly!

Summary of Contents for AQC-D6

Page 1: ...AQC D6 ClO2 measuring cell measuring module Installation and operating instructions GRUNDFOS INSTRUCTIONS...

Page 2: ...ation 8 9 Commissioning 8 9 1 Water connections 8 9 2 Electrical connections 9 9 3 Preparing the measuring system 10 9 4 Starting up the measuring system 11 9 5 Starting up the measuring module 11 9 6...

Page 3: ...s are used for measuring the concentration of chlorine dioxide in water within the scope of the potential applications described in this manual 5 Safety 5 1 Obligations of the owner operations manager...

Page 4: ...esponse time T90 30 seconds Temperature drift Temperature compensated measuring signal Permissible process water temperature 5 to 70 C Sample water flow rate Minimum 30 l h Maximum permitted pressure...

Page 5: ...3 Dimensional sketch drilling diagram Fig 3 AQC D6 Fig 4 Measuring module All dimensions in mm TM06 8111 4616 300 260 360 395 58 10 TM06 8112 4616 Height Width Depth 650 550 180 550 500 450 10 5 DN20...

Page 6: ...er The measuring cell is controlled with a potentiostat integrated in the measuring amplifier A precisely defined potential of the measuring electrode is retained through a reference system This resul...

Page 7: ...stream of sample water through the bypass It is designed specifically for compensating the internal pressure drops The extraction and feed line must therefore be kept as short as possible Sample wate...

Page 8: ...nnect hose 6 8 mm to a suitable drain Feed the fluid back to the pipework 9 1 2 Measuring module water connections The standard scope of delivery includes one PP and one PVC insertion section each for...

Page 9: ...Electrical connections may only be set up by authorised personnel Warning Switch off the power supply before connecting the power supply cable and the relay contacts Observe the local safety regulati...

Page 10: ...pos 2 Loosen the PDVF ring with 1 thread pos 1 Fit the measuring cell pos 3 in the flow fitting pos 2 1 Remove the protection cap 2 Slide the measuring cell into the flow fitting until the liquid flow...

Page 11: ...tons on the measuring amplifier in the Setup menu to select the Measuring cell line and press OK to access the corresponding menu 2 Use the Up and Down buttons to select the desired AQC D6 measuring c...

Page 12: ...calibration the regulators are switched off and the actuators closed to prevent overdosing 10 Operation 10 1 Switching on 10 2 Operation 10 3 Interruptions 10 3 1 Storage and handling when not in use...

Page 13: ...d Deposits on electrode finger Unscrew the electrolyte chamber Rinse the electrode finger dry it with a dry paper towel and carefully clean just the tip of the electrode finger with the special emery...

Page 14: ...5 Filling up with electrolyte 1 Screw the electrolyte chamber onto the measuring cell so that the socket of the electrolyte flange just fits into the gap approximately 5 mm 2 Fill electrolyte right up...

Page 15: ...namento delle legislazioni degli Stati membri UE NL EU conformiteitsverklaring Wij Grundfos verklaren geheel onder eigen verantwoordelijkheid dat de producten AQC D11 AQC D12 AQC D13 AQC D6 waarop de...

Page 16: ...16...

Page 17: ...ia S r l Via Gran Sasso 4 I 20060 Truccazzano Milano Tel 39 02 95838112 Telefax 39 02 95309290 95838461 Japan GRUNDFOS Pumps K K 1 2 3 Shin Miyakoda Kita ku Hamamatsu 431 2103 Japan Phone 81 53 428 47...

Page 18: ...splayed in this material including but not limited to Grundfos the Grundfos logo and be think innovate are registered trademarks owned by The Grundfos Group All rights reserved 2019 Grundfos Holding A...

Reviews: