12. Maintenance

Interval for functional check

• At least once a week.

Interval for cleaning

• Whenever faults occur.
• Every 6 months.

Interval for replacing the electrolyte

• Every 6 months.

12.1 Functional check

Calibration check

• Recalibrate the measuring cell with an analytically determined 

value at least once a week.

Observe section 

9.7 Calibration

 and the Oxiperm Pro installation 

and operating instructions.

Sample water flow check

• Check and, if necessary, adjust the sample water flow rate 

through the measuring cell.

Functional check of the measuring module

• Check the bypass for leaks.
• Check the circulating pump for noisy operation.

12.2 Cleaning

To check the fill level of the electrolyte or clean the measuring cell 
in the event of malfunctions, the electrolyte chamber must first be 
unscrewed.
When cleaning, the following cleaning steps are performed in 
sequence.
Please also refer to the measuring cell graphic in section 

7.2 Design of the measuring cell

.

12.2.1 Switching off the measuring cell

1. Switch off the power supply. If this is not possible, remove the 

cable on the measuring cell.

2. Switch off the sample water supply.

12.2.2 Removing the measuring cell

1. Remove the measuring cell from the flow fitting.

12.2.3 Cleaning the electrolyte chamber 

1. Unscrew the electrolyte chamber.

In the event of limescale deposits:

2. Soak the electrolyte chamber for a few hours in approximately 

1 % hydrochloric acid until clean.

3. Rinse with clean water.

12.2.4 Cleaning the electrode 

In the event of heavy soiling, the electrode must be cleaned.
1. Rinse the electrode finger (= measuring electrode) with clean 

water, and then dry it with a clean paper towel.

2. Use the special emery paper provided to carefully clean the 

gold tip of the dry electrode finger.

– Place the emery paper on a dry paper towel, and hold the 

edge of the emery paper.

– Hold the measuring cell vertically, and then rub the tip of the 

electrode carefully over the emery paper two or three times.

12.2.5 Filling up with electrolyte

1. Screw the electrolyte chamber onto the measuring cell so that 

the socket of the electrolyte flange just fits into the gap 
(approximately 5 mm).

2. Fill electrolyte right up to the overflow, making sure there are 

no bubbles.

3. Screw on and tighten the electrolyte chamber by hand.

– There must not be any air bubbles in the electrolyte 

chamber.

– The electrolyte is considered safe to handle.

12.2.6 Screwing on the measuring cell

Please refer to section 

9.3 Preparing the measuring system

.

12.2.7 Starting up the measuring system after it has been out 

of service

Please refer to section 

9.4 Starting up the measuring system

.

• For details on recalibration, please refer to section 

9.7 Calibration

.

13. Spare parts

Accessories and wear parts

14. Disposal

This product or parts of it must be disposed of in an 
environmentally sound way. Use appropriate waste collection 
services. If this is not possible, contact the nearest Grundfos 
company or service workshop. 

Caution

Always recalibrate the measuring system after 
cleaning or maintenance has been performed!

Caution

The emery paper should only be used to clean the 
precious metal tip (gold) on the electrode tip of 
soiling. The remaining surface (metal coating) of the 
electrode finger must not be sanded or removed!

Caution

Do not use any other kind of electrolyte! Damaging 
the electrode by using the wrong kind of liquid voids 
all warranty claims!

Description

Product number

Measuring cell

 95708117 (314-180)

Spare parts set, consisting of 
electrolyte and emery 

95708819 (553-1758)

Connecting cable for measuring 
cell, 2 metres

 91835331 (45.10124)

Connecting cable for measuring 
cell, 5 metres

 95708119 (45.10124/5)

Connecting cable for measuring 
cell, 10 metres

 95708120 (45.10124/10)

UPS 25-60N circulator pump

 96913085 (53.650-1)

HD-PE hose 6/8 mm, 2 metres

 95709109 (526-011/2) 

HD-PE hose 6/8 mm, 5 metres

 95709110 (526-011/5)

HD-PE hose 6/8 mm, 10 metres

 95709108 (526-011/10)

Note

The measuring module and its associated parts must 
be disposed of in an environmentally sound

 

way!

The system may only be dismantled by authorised 
and qualified personnel!
The operator is responsible for 
environmentally-friendly disposal!

Summary of Contents for AQC-D6

Page 1: ...AQC D6 ClO2 measuring cell measuring module Installation and operating instructions GRUNDFOS INSTRUCTIONS...

Page 2: ...ation 8 9 Commissioning 8 9 1 Water connections 8 9 2 Electrical connections 9 9 3 Preparing the measuring system 10 9 4 Starting up the measuring system 11 9 5 Starting up the measuring module 11 9 6...

Page 3: ...s are used for measuring the concentration of chlorine dioxide in water within the scope of the potential applications described in this manual 5 Safety 5 1 Obligations of the owner operations manager...

Page 4: ...esponse time T90 30 seconds Temperature drift Temperature compensated measuring signal Permissible process water temperature 5 to 70 C Sample water flow rate Minimum 30 l h Maximum permitted pressure...

Page 5: ...3 Dimensional sketch drilling diagram Fig 3 AQC D6 Fig 4 Measuring module All dimensions in mm TM06 8111 4616 300 260 360 395 58 10 TM06 8112 4616 Height Width Depth 650 550 180 550 500 450 10 5 DN20...

Page 6: ...er The measuring cell is controlled with a potentiostat integrated in the measuring amplifier A precisely defined potential of the measuring electrode is retained through a reference system This resul...

Page 7: ...stream of sample water through the bypass It is designed specifically for compensating the internal pressure drops The extraction and feed line must therefore be kept as short as possible Sample wate...

Page 8: ...nnect hose 6 8 mm to a suitable drain Feed the fluid back to the pipework 9 1 2 Measuring module water connections The standard scope of delivery includes one PP and one PVC insertion section each for...

Page 9: ...Electrical connections may only be set up by authorised personnel Warning Switch off the power supply before connecting the power supply cable and the relay contacts Observe the local safety regulati...

Page 10: ...pos 2 Loosen the PDVF ring with 1 thread pos 1 Fit the measuring cell pos 3 in the flow fitting pos 2 1 Remove the protection cap 2 Slide the measuring cell into the flow fitting until the liquid flow...

Page 11: ...tons on the measuring amplifier in the Setup menu to select the Measuring cell line and press OK to access the corresponding menu 2 Use the Up and Down buttons to select the desired AQC D6 measuring c...

Page 12: ...calibration the regulators are switched off and the actuators closed to prevent overdosing 10 Operation 10 1 Switching on 10 2 Operation 10 3 Interruptions 10 3 1 Storage and handling when not in use...

Page 13: ...d Deposits on electrode finger Unscrew the electrolyte chamber Rinse the electrode finger dry it with a dry paper towel and carefully clean just the tip of the electrode finger with the special emery...

Page 14: ...5 Filling up with electrolyte 1 Screw the electrolyte chamber onto the measuring cell so that the socket of the electrolyte flange just fits into the gap approximately 5 mm 2 Fill electrolyte right up...

Page 15: ...namento delle legislazioni degli Stati membri UE NL EU conformiteitsverklaring Wij Grundfos verklaren geheel onder eigen verantwoordelijkheid dat de producten AQC D11 AQC D12 AQC D13 AQC D6 waarop de...

Page 16: ...16...

Page 17: ...ia S r l Via Gran Sasso 4 I 20060 Truccazzano Milano Tel 39 02 95838112 Telefax 39 02 95309290 95838461 Japan GRUNDFOS Pumps K K 1 2 3 Shin Miyakoda Kita ku Hamamatsu 431 2103 Japan Phone 81 53 428 47...

Page 18: ...splayed in this material including but not limited to Grundfos the Grundfos logo and be think innovate are registered trademarks owned by The Grundfos Group All rights reserved 2019 Grundfos Holding A...

Reviews: