10. Installing the pump

10.1 Installation depth

The dynamic water level should always be above the 
pump, see fig. 10.
A = Dynamic water level 
B = Static water level 
C = Minimum 3 inch well diameter 
D = Drawdown 
E = Installation depth below static water level.

Maximum 500 feet.

Fig. 10 

Installation depth

Procedure:

To install the pump, proceed as follows:
1. Attach the enclosed data plate sticker at the well 

head.

2. Check the well for proper clearance. The well must 

be at least 3 inches in diameter. It is a good idea to 
check the well for clearance using a plumb ring 
(2.95 ø x 10 in.). 

3. Attach the first section of riser pipe to the pump. 
4. Lower the pump into the well. Make sure the mo-

tor cable is not damaged when the pump is lifted 
or lowered into the well, especially in 3 inch wells.

Note:

 Do not lower or lift the pump using the mo-

tor cable. 

5. When the pump has been installed to the required 

depth, the installation should be finished by 
means of a well seal. 
Note that the dynamic water level should always 
be above the pump.

6. Loosen the safety wire so that it becomes un-

loaded and lock it to the well seal using a cable 
clamp.

7.

Complete the electrical connections.

Note: 

The pump must never be connected to a capaci-

tor or to another type of control box than CU 300 or 
CU 301. 

Installation depths:

Maximum installation depth:
500 feet below the static water level. 
Minimum installation depth:
1.75 feet below the dynamic water level.

Vertical installation:

During start-up and operation, the pump must always 
be completely submerged in water.

Horizontal installation: 

The pump must be installed at least 1.75 feet below 
the dynamic water level. 
If there is a risk that the pump might be covered by 
mud, the pump must always be placed in a flow 
sleeve.

Note:

 Do not lower or lift the pump using the motor 

cable. 

11. Generator operation

It is safe to operate the SQ/SQE with a generator.
The generator must be sized 50% above the P1 (input 
power) values of the pump. See the following table.

TM

02 87

40

 0804

A

B

D

C

E

Motor

[hp]

Min.

generator size 

[W]

Recommended 

generator output 

[W]

0.5

1200

1500

0.75

1900

2500

1.0

2600

3200

1.5

2800

3500

Summary of Contents for 10SQ-110

Page 1: ...SQ SQE Installation and operating instructions GRUNDFOS INSTRUCTIONS...

Page 2: ...ce under this warranty the defective product must be returned to the distributor or dealer of Grundfos products from which it was purchased together with proof of purchase and installation date failur...

Page 3: ...3 SQ SQE Installation and operating instructions Page 4...

Page 4: ...works pressure boosting irrigation systems liquid transfer in tanks 2 Preinstallation 2 1 Well preparation If the pump is to be installed in a new well the well should be fully developed and bailed or...

Page 5: ...rundfos motor liquid type SML 2 which will pro tect the motor liquid down to 4 F 20 C and prevent the growth of bacteria The level of motor liquid is im portant for the operating life of the bearings...

Page 6: ...10 6 50 60 Hz The current consumption can only be measured accu rately by means of a true RMS instrument If other in struments are used the value measured will differ from the actual value The SQE pum...

Page 7: ...ctrical putty tightly around each Sta Kon The putty should overlap on the insulation of the wire 7 Use a good quality tape such as 33 Scotch Water proof or Plymouth Rubber Company Slipknot Grey Wrap e...

Page 8: ...g 8 Fitting the cable guard to the pump suction strainer 9 Piping The pump should only be gripped by the two flats at the top of the pump see fig 9 The pump can be installed vertically or horizontally...

Page 9: ...that the dynamic water level should always be above the pump 6 Loosen the safety wire so that it becomes un loaded and lock it to the well seal using a cable clamp 7 Complete the electrical connection...

Page 10: ...effective only within the recommended duty range of the pump Note Do not let the pump run against a closed dis charge valve for more than 5 minutes When the dis charge valve is closed there is no coo...

Page 11: ...the motor 4 Screw the pump end on the motor 55 Nm Note The pump shaft must engage with the mo tor shaft A spanner may be used on the clamping faces of the pump end see fig 12 5 Fit the cable guard as...

Page 12: ...y choked by impurities iron bacteria Clean or replace the discharge pipe d The check valve of the pump is blocked Pull the pump and clean or replace the valve e The pump and the riser pipe are partly...

Page 13: ...st High voltage test M V 1 Supply voltage TM00 1371 5092 Measure the voltage L1 RMS between phase and L2 Connect the voltmeter to the terminals at the connections The voltage should when the motor is...

Page 14: ...NPT 22 30 SQ SQE 1 NPT Storage conditions Minimum ambient temperature 4 F Maximum ambient temperature 140 F Freeze protection Note The motor must not be stored without being filled with motor liquid I...

Page 15: ...PT 10SQ SQE 290 1 0 230 3 15 3 1 NPT 10SQ SQE 330 1 5 230 3 15 3 1 NPT 15SQ SQE 70 0 5 230 115 4 20 3 1 NPT 15SQ SQE 110 0 5 230 115 4 20 3 1 NPT 15SQ SQE 150 0 75 230 4 20 3 1 NPT 15SQ SQE 180 0 75 2...

Page 16: ...500 Canada GRUNDFOS Canada Inc 2941 Brighton Road Oakville Ontario L6H 6C9 Phone 1 905 829 9533 Telefax 1 905 829 9512 Mexico Bombas GRUNDFOS de Mexico S A de C V Boulevard TLC No 15 Parque Industrial...

Page 17: ......

Page 18: ...Being responsible is our foundation Thinking ahead makes it possible Innovation is the essence www grundfos com L SP TL 017 R 5 06 US R PRINTED IN USA...

Reviews: