background image

 

Index 

 

 

26 | 32 

 

 

Index 

 
 

C

 

Consumables .................................................................... 19 

I

 

Inspection .......................................................................... 18 
Installation ......................................................................... 12 

M

 

Maintenance ...................................................................... 18 

R

 

Resin bag ................................................. 6, 8, 13, 15, 16, 22 

S

 

Safety ................................................................................. 7 
Spare parts ....................................................................7, 19 
Start-up ............................................................................. 15 

T

 

Type designation plate ........................................................ 6 

W

 

Wearing parts ................................................................... 19 

 

 

 

 

 

 

Summary of Contents for desaliQ:MA

Page 1: ...We understand water Mixed bed cartridge desaliQ MA Operation manual...

Page 2: ...this operation manual Without the written consent of Gr nbeck Wasseraufbereitung GmbH no part of this manual may be reproduced in any way nor may any part be processed duplicated or distributed using...

Page 3: ...lation 12 4 1 Requirements with regard to the installation site 12 4 2 Checking the scope of supply 13 4 3 Installing the product 14 5 Start up 15 5 1 Preparations 15 5 2 How to start up the product 1...

Page 4: ...uments This manual and all other applicable documents must be kept so as to be available if required 1 4 Symbols used This symbol identifies instructions that you must comply with for your personal sa...

Page 5: ...icated as follows 1 First step a First step of the first action b Second step of the first action 2 Second step Results of an instruction are shown as follows Result 1 5 2 Lists List symbols used Firs...

Page 6: ...rmation in the table below to have it readily available whenever necessary Item Designation Item Designation 1 Observe operation manual 2 Nominal connection diameter 3 Nominal pressure 4 Nominal flow...

Page 7: ...fety instructions This manual contains information and instructions that you must comply with for your own personal safety as well as to avoid damage to property The information and instructions are h...

Page 8: ...the required inspection and maintenance work is carried out Keep this manual 2 5 Safety information for the specific system CAUTION Danger of injury due to mechanical damage to the mixed bed cartridge...

Page 9: ...The desaliQ MA mixed bed cartridges cannot be used in the following sectors Treatment of raw water to be used as drinking water Operation with gas cushions In combination with automatic fittings for...

Page 10: ...he water meter with connection material can be integrated into the raw water feed line at a 3 4 male thread by means of the double screw connection supplied with the system Euro system separator GENO...

Page 11: ...ium magnesium or sodium are exchanged for H ions The anion exchanger resin is used in full demineralisation to filter off negatively charged ions the so called anions All anions such as nitrate phosph...

Page 12: ...ose set Fig installation example for desaliQ MA9 mixed bed cartridge 4 1 Requirements with regard to the installation site Please observe local installation directives general guidelines and technical...

Page 13: ...tridge Make sure that the opening pressure set on the safety valve does not exceed the maximum permissible operating pressure stated on the type designation plate NOTE The installation site must have...

Page 14: ...g water if the system separator is missing The mixed bed cartridges are not intrinsically safe If the mixed bed cartridges are installed without a filling device and there is no system separator downs...

Page 15: ...tart up the product 1 Slowly increase the water supply 2 Press the green lever to bleed the mixed bed cartridge 3 Leave all valves open 4 Switch on the conductivity meter 000 should appear on the disp...

Page 16: ...idge to run until empty 6 Secure the mixed bed cartridge in position using its legs 7 Depress the lid slightly and turn it 1 8 in an anti clockwise direction to remove it 8 Leave the shut off valve at...

Page 17: ...n using its legs 5 Depress the lid slightly and turn it 1 8 in a clockwise direction The system is ready for operation 6 3 Transportation and storage between assignments When transporting and storing...

Page 18: ...cleaning agents containing solvents Such substances damage components made of plastic Only clean the external surfaces of the product Do this using a cloth moistened in water 7 3 Inspection Check the...

Page 19: ...age to the system if unsuitable spare parts are used There is a risk of functional impairments malfunctions and loss of warranty Only use genuine spare parts You may order spare parts from your local...

Page 20: ...d the mixed bed cartridge completely The mixed bed cartridge is used up Replace the resin bag The residual conductivity rises rapidly after a long period of operational downtime Re Ionisierung has occ...

Page 21: ...ot dispose of the packaging the products and or accessories in the household waste Comply with the applicable national regulations for disposal Make sure that the packaging the product and the accesso...

Page 22: ...epth mm 330 680 Number of resin bags pcs 2 4 Filling volume of mixed bed resin l 12 24 Shipping weight kg 17 42 Connection data Nominal connection diameter Performance data Nominal pressure PN 6 Flow...

Page 23: ...3 32 General Water temperature C 5 30 Ambient temperature C 5 40 10 1 Capacity curve of desaliQ MA9 mixed bed cartridge Item Designation Item Designation 1 Volume of demineralised water in m 2 Conduct...

Page 24: ...f desaliQ MA13 Item Designation Item Designation 1 Volume of demineralised water in m 2 Conductivity of raw water in S cm 10 3 Pressure loss curves of desaliQ MA mixed bed cartridge Item Designation I...

Page 25: ...he domestic environment for drinking and all other food preparation purposes for personal hygiene and cleaning as well as for cleaning objects that do not only temporarily come into contact with foods...

Page 26: ...Index 26 32 Index C Consumables 19 I Inspection 18 Installation 12 M Maintenance 18 R Resin bag 6 8 13 15 16 22 S Safety 7 Spare parts 7 19 Start up 15 T Type designation plate 6 W Wearing parts 19...

Page 27: ...Notes 27 32 Notes...

Page 28: ...Notes 28 32 Notes...

Page 29: ...Notes 29 32 Notes...

Page 30: ...Notes 30 32 Notes...

Page 31: ......

Page 32: ...Gr nbeck Wasseraufbereitung GmbH Josef Gr nbeck Strasse 1 89420 Hoechstaedt Germany For more information go to www gruenbeck com 49 9074 41 0 49 9074 41 100 info gruenbeck com www gruenbeck com...

Reviews: