Start-up
15 | 32
5
Start-up
5.1
Preparations
► Make sure that the resin bag has been fitted correctly: Seam parallel with the rim
of the container, tear-off sticker facing upwards.
5.2
How to start up the product
1.
Slowly increase the water supply.
2.
Press the green lever to bleed the mixed-bed cartridge.
3.
Leave all valves open.
4.
Switch on the conductivity meter.
» 000 should appear on the display.
5.
Replace the resin as soon as the desired limit value is shown on the display.
(We recommend a max. of 50 µS/cm)
The conductivity meter switches off automatically after approx. 10 minutes.
Summary of Contents for desaliQ:MA
Page 1: ...We understand water Mixed bed cartridge desaliQ MA Operation manual...
Page 27: ...Notes 27 32 Notes...
Page 28: ...Notes 28 32 Notes...
Page 29: ...Notes 29 32 Notes...
Page 30: ...Notes 30 32 Notes...
Page 31: ......