Installation
13 | 32
CAUTION:
Danger due to mechanical energy! System components may be subject to
overpressure.
● Danger of injury and damage to property due to escaping water and unexpected
movement of system components.
► Fit a suitable pressure reducing device into the pressurised line upstream of the
mixed-bed cartridge.
► Fit an approved safety valve for the specified pressure range into the pressurised
line upstream of the mixed-bed cartridge.
► Make sure that the opening pressure set on the safety valve does not exceed the
maximum permissible operating pressure stated on the type designation plate.
NOTE:
The installation site must have a floor drain. Floor drains leading to a lifting system
do not work in case of a power failure.
● Possible flooding of the rooms if no floor drain is provided.
► Install a water stop device.
4.2
Checking the scope of supply
Item
Designation
Item
Designation
1
Mixed-bed cartridge with conductivity meter
and resin bag
2
Operation manual
3
Transport trolley (only for desaliQ:MA13)
► Check the scope of supply for completeness and possible damage.
Summary of Contents for desaliQ:MA
Page 1: ...We understand water Mixed bed cartridge desaliQ MA Operation manual...
Page 27: ...Notes 27 32 Notes...
Page 28: ...Notes 28 32 Notes...
Page 29: ...Notes 29 32 Notes...
Page 30: ...Notes 30 32 Notes...
Page 31: ......