33' Doorway Installation
8 of 12
Front Rafters
16
17
18
Attach front Rafters so they are plumb and flush with
the front of the door frame. Use 2-1/2" screws as shown.
(Ridge is sent long and will need to be trimmed in the
field.)
Reminder: Predrill all screwholes.
Securing Ridge
Predrill through tape to prevent tearing.
Using a 3" screw, secure the angled end of the
ridge to the Vertical Pentagon Support as shown.
3" Screw
2 1/2" Screws
Cross Rafter Support
Attach Cross Rafter Support. Use 3" screws.
3" Screws