background image

33' Doorway Installation

7 of 12

  

Left and Right Upper Pentagon Glazing Panels

 

13

14

15

Trim a notch in the glazing panels around Side Rafter Supports.
Use a circular saw or jigsaw with plywood blade. Make sure to
use eye and ear protection. Attach with 1-1/2" ss screws. 
Note: Do not attach bottom edge until Step 14 is complete.

Mark & trim top 
edge & corner
of panels

Tape Seams and Attach Bottom Cap

Tape the vertical and horizontal seams with 2" 8672 tape.
Find the bottom cap with no holes and slide it on the exposed 
polycarbonate edge above doorway, with long side towards 
the exterior of the dome. Attach to Horizontal Glazing Support 
with (4) 1-1/2" ss screws. Finish attaching bottom edge of 
Upper Pentagon Panels.

tape

here

bot

tom

 ca

p

tape
here

Ridge

16"

Begin by screwing  upper portion of middle rafters onto Ridge, 
approximately 16" from angled edge. Adjust placement so that 
ridge is level, and make a mark on the glazing. Run a level 
vertically to get a plumb line against the front edge of the ridge 
and make a mark. Remove the assembly and cut the front
edge of the ridge. Place the rafter and ridge back using the mark 
that indicated level. Screw the bottom portion of the middle Rafters
to the Side Rafter Supports. Use 2-1/2" screws as shown.

2 1/2"

Screws

Mark 
Ridge 
Here 

Mark 
Glazing 
Here 

Cut out here

(before removing  

protective film)

Summary of Contents for Doorway

Page 1: ...33 Doorway Installation 1 of 12 Doorway Installation Manual...

Page 2: ...ort 33CRS 2 Planted Rafters 33PR 1 Ridge Support 33RS 1 Bottom Plate Extender 33BPE Cut out from foundation wall framing Never trim factory edge of glazing Wear eye and ear protection when cutting gla...

Page 3: ...opening prior to cutting 1 Transfer the marks made on the B Top Wall Plate 2 Make marks to the inside of the doorway studs 3 Measure opening according to doorway width 41 Make sure B Base Strut is att...

Page 4: ...is level set the Headers 2 2x4s on edge on the top of the door frame but do not attach Mark the location of the back Header Periodically check that the opening is square by measuring from the top lef...

Page 5: ...f the Front Sloping Piece Attach Side Rafter Supports into Front Sloping Piece checking again for level Use 2 1 2 screws as shown 2 1 2 screws 3 screws Tie plate with tico nails 2 1 2 screws 3 screws...

Page 6: ...and 5 more spaced evenly as shown At this time move on to Step 9 of the dome installation manual Foundation Wall Trim Strips Leave extra length on the Horizontal Trim 3 past the cut doorway opening a...

Page 7: ...rds the exterior of the dome Attach to Horizontal Glazing Support with 4 1 1 2 ss screws Finish attaching bottom edge of Upper Pentagon Panels tape here bottom cap tape here Ridge 16 Begin by screwing...

Page 8: ...crews as shown Ridge is sent long and will need to be trimmed in the field Reminder Predrill all screwholes Securing Ridge Predrill through tape to prevent tearing Using a 3 screw secure the angled en...

Page 9: ...w through the glazing from the back using 1 1 2 ss screws Screw diagonally into the Ridge and Side Rafter Supports from the front using 2 1 2 screws Ridge Support The Ridge Support is sent long and ne...

Page 10: ...ap on the glazing side edge of strip Note Roof Glazing not shown attached here to show the screw pattern for Left and Right Wall Glazing Panels 24 Bottom Plate Extender Attach Bottom Plate Extender Us...

Page 11: ...ing Ridge and Joints The Door Front panels are sent wide and will need to be trimmed in field with a plywood blade Attach siding Door Fronts Use 1 1 2 ss screws Tape the ridge and joints where the gla...

Page 12: ...Vertical Trim Strips between wall sections Finish attaching the Horizontal Trim Strip Trim so it ends at edge of siding Door Front Attach last Bottom Caps sent long trim to fit using tin snips Then a...