background image

8

Installation

6.Mark the holes in the backplate for wall-

plugs, see Fig. [4].

7.Drill the holes (6mm) for the wallplugs (F) 

and fit them into the wall, see Fig. [5].

8.Fix the backplate (D) with set screw (D1) 

on top or bottom to the wall with 
screws (G), see Fig. [6].

  

   9. Slide the escutcheons (H) over the 

supply pipes and install filters (J), see 
Fig. [7].

 10. Slide the valve body (E) with elbows and 

compression nuts loosely over the 
supply pipes.

 

The body must touch the backplate. If 
not, check pipes for length again.

 11. Fix the valve body (E) to the back-

plate (D) by tightening set screw (D1).

Do not

 use excessive force to tighten 

the set screw (D1).

 12.Tighten the compression nuts (torque 

min. 20 Nm), see Fig. [8].

4

5

F

6

G

D

D1

7

E

2.5

mm

D1

H

J

D

8

24

mm

Summary of Contents for Avensys 34 084

Page 1: ...1 I 5 N 9 GR 13 TR 17 BG 21 RO 25 GB 2 NL 6 FIN 10 CZ 14 SK 18 EST 22 CN 26 F 3 S 7 PL 11 H 15 SLO 19 LV 23 RUS 27 E 4 DK 8 UAE 12 P 16 HR 20 LT 24 Avensys Avensys 95 620 431 M 205474 11 06 34 084 GB...

Page 2: ...I Valve Body Wallplugs Screws Escutcheons Filters Threaded Rings Flow Limiters Handshower Filter Flexible Hose Shower Rail Outlet Nipple Plug Backplate Table Of Contents Installation Dimensions mm 1 2...

Page 3: ...II Spare Parts 3 4...

Page 4: ...seal 01 287 10 9 4 Filter 06 768 5 9 5 Escutcheon 00 197 2 10 Handshower 28 261 1 11 Filter 07 002 2 12 Shower rail 28 666 1 12 1 Sliding shower holder 07 659 1 12 2 Shower rail holder 45 362 1 12 2 1...

Page 5: ...oughly flushed before installing the mixing valve GROHE recommends installing isolating valves upstream of the mixing valve for servicing purposes New Water Regulations This GROHE product should be in...

Page 6: ...re preassembled to the valve body The valve body is fixed to the backplate by a set screw In case of exposed installation with supply pipes from above or below rotate inlet elbows 90 and connect to 15...

Page 7: ...he escutcheons H over the supply pipes and install filters J see Fig 7 10 Slide the valve body E with elbows and compression nuts loosely over the supply pipes The body must touch the backplate If not...

Page 8: ...must be dismounted rotated 180 and reinstalled Shower Hose Connection 1 Close free outlet with plug K see Fig 10 2 Remove O ring seal L1 3 Turn outlet nipple L 180 and fit O ring seal L1 4 Thread the...

Page 9: ...ounter clockwise to fully open position and open water flow 2 Turn the temperature handle counter clockwise to maximum hot water temperature 3 Lever out cap M see fig 11 4 Unscrew screw N 5 Pull off t...

Page 10: ...nections and take valve from the supplies 13 Screw out control unit U see Fig 14 14 Take out O ring seal U1 15 Take out wax element V slider W and spring X Inspect and clean all parts replace if neces...

Page 11: ...lip P1 16 Reinstall the temperature handle O in position hot water 17 Fix temperature handle with screw N and cover with cap M Readjustment is necessary after every maintenance operation on the contro...

Page 12: ...posits do oc cur remove them with Grohclean ref no 45 939 our environment friendly cleaning liquid Grohclean is specially formulated to gently clean the surface of our Problem Cause Remedy Thermostati...

Page 13: ...14...

Page 14: ...t all functional defects for which we are responsible limitations see E F B It is our option if we correct the defects by repair or replacement C During the above guarantee period we will not charge f...

Reviews: