OM-CFPC
5
Inspection and Unpacking
The unit will arrive completely assembled,
wrapped in protective plastic on a heavy skid, in
a heavy cardboard carton. Immediately upon
receipt, inspect the carton for damage. Report
any apparent shipping damage or an incorrect
shipment to the delivery agent.
When installation is to begin, get someone to
assist in removing the carton. Lift it straight up
and away from the unit.
Do not simply raise it
and push backwards - you will break the
cover assembly vent handle.
Write down the
model number, serial number, and installation
date of your unit, and keep this information for
future reference. Space for these entries is
provided at the top of the Service Log in this
manual.
Cut the straps holding the unit on the skid, and
lift the unit straight up off the skid.
CAUTION
SHIPPING STRAPS ARE UNDER TENSION
AND CAN SNAP BACK WHEN CUT.
UNIT WEIGHS
545 TO 685 LB. (248 TO 310
KG). FOR SAFE HANDLING, INSTALLER
SHOULD OBTAIN HELP AS NEEDED, OR
EMPLOY APPROPRIATE MATERIALS
HANDLING EQUIPMENT (SUCH AS A
FORKLIFT, DOLLY, OR PALLET JACKET)
TO REMOVE THE UNIT FROM THE SKID
AND MOVE IT TO THE PLACE OF
INSTALLATION.
Summary of Contents for CFPC
Page 12: ...OM CFPC 12 Parts List Model CFPC...
Page 14: ...OM CFPC 14 Parts List Model CFPC 2...
Page 17: ...OM CFPC 17 Wiring Diagrams...
Page 18: ...OM CFPC 18 Wiring Diagrams...
Page 19: ...OM CFPC 19 Wiring Diagrams...
Page 20: ...OM CFPC 20 Wiring Diagrams...
Page 21: ...OM CFPC 21 Wiring Diagrams...
Page 22: ...OM CFPC 22 Wiring Diagrams...
Page 23: ...OM CFPC 23 Wiring Diagrams...
Page 27: ...OM CFPC 27 NOTES...