background image

OM-CFPC

5

Inspection and Unpacking

The unit will arrive completely assembled,
wrapped in protective plastic on a heavy skid, in
a heavy cardboard carton. Immediately upon
receipt, inspect the carton for damage. Report
any apparent shipping damage or an incorrect
shipment to the delivery agent.

When installation is to begin, get someone to
assist in removing the carton.  Lift it straight up
and away from the unit. 

Do not simply raise it

and push backwards - you will break the
cover assembly vent handle. 

Write down the

model number, serial number, and installation
date of your unit, and keep this information for
future reference. Space for these entries is
provided at the top of the Service Log in this
manual. 

Cut the straps holding the unit on the skid, and
lift the unit straight up off the skid.

CAUTION

SHIPPING  STRAPS  ARE  UNDER  TENSION
AND CAN SNAP BACK WHEN CUT.

UNIT WEIGHS

 

545 TO 685 LB. (248 TO 310

KG). FOR SAFE HANDLING, INSTALLER
SHOULD OBTAIN HELP AS NEEDED, OR
EMPLOY APPROPRIATE MATERIALS
HANDLING  EQUIPMENT  (SUCH  AS  A
FORKLIFT,  DOLLY,  OR  PALLET JACKET)
TO  REMOVE  THE  UNIT FROM THE SKID
AND  MOVE  IT  TO  THE PLACE OF
INSTALLATION.

Summary of Contents for CFPC

Page 1: ...2 Braising Pans Stainless Steel Cabinet Mounted Power Tilting Electrically Heated THIS MANUAL MUST BE RETAINED FOR FUTURE REFERENCE READ UNDERSTAND AND FOLLOW THE INSTRUCTIONS AND WARNINGS CONTAINED...

Page 2: ...ALL DIRECT CONTACT WITH HOT FOOD OR WATER IN THE BRAISING PAN DIRECT CONTACT COULD RESULT IN SEVERE BURNS WARNING IF THE PAN CONTAINS ITEMS IN SAUCE OR MELTED FAT THEY COULD SLIDE FORWARD SUDDENLY DU...

Page 3: ...R WARNINGS READ FIRST 2 EQUIPMENT DESCRIPTION 4 INSTALLATION 5 INITIAL START UP 5 OPERATION 6 SEQUENCE OF OPERATION 7 CLEANING 8 MAINTENANCE 10 TROUBLESHOOTING 10 PARTS LISTS 12 DIAGRAMS SCHEMATICS 16...

Page 4: ...trol of cooking temperature Turning the thermostat dial starts and stops heating and sets the pan temperature Installation requires two electrical connections 115 Volt service for the tilting actuator...

Page 5: ...eak the cover assembly vent handle Write down the model number serial number and installation date of your unit and keep this information for future reference Space for these entries is provided at th...

Page 6: ...erve local codes and or the National Electrical Code in accordance with ANSI NFPA 70 latest edition 5 Any mechanical or electrical change must be approved by the Groen Food Service Engineering Departm...

Page 7: ...ure loss at a minimum or leave it up to help dry the product Set the thermostat higher to cook or drive moisture off faster The thermostat may be adjusted to any setting in its range to cook exactly a...

Page 8: ...the thermostat switch opens and causes the contactors to open This stops the flow of power to the heating elements and the indicator light As soon as the thermostat senses that the pan is cooling bel...

Page 9: ...ce every 12 hours CAUTION KEEP WATER AND SOLUTIONS OUT OF CONTROLSANDELECTRICALEQUIPMENT DO NOT SPRAY OR HOSE THE CONTROL B O X O R O T H E R E L E C T R I C A L CONNECTIONS THEY ARE NOT WATER PROOF b...

Page 10: ...CAUSE CORROSION k After the unit has been cleaned sanitized and drained let all surfaces air dry unless the unit must be used again right away l It is recommended that the unit be sanitized just befo...

Page 11: ...box REPLACE A BLOWN FUSE ONLY WITH A FUSE OF THE SAME AMP RATING Auth Service Rep Only c For loose or broken wire Y d Thermostat functioning by listening for a click when the switch opens or closes Y...

Page 12: ...OM CFPC 12 Parts List Model CFPC...

Page 13: ...for 208V 012842 8 Spacer Long Rear 012733 25 Heater Strip 1000W for 240 380V 012843 9 Actuator Cover Model 51 014085 26 Heater Strip 1000W for 480V 012908 10 Spring High Pressure 012533 27 Foot Bulle...

Page 14: ...OM CFPC 14 Parts List Model CFPC 2...

Page 15: ...or 380 Volt 054761 8 Pin Actuator Hinge 012525 23 Block Terminal 002577 9 Spacer Front 012528 24 Fuse SC6 6 AMP 003982 10 Ring External Retaining not shown 012529 25 Capacitor 18 F 050384 11 Spring Hi...

Page 16: ...nuary 1 1985 have been wired for three phase power supply The models affected are Size 3 208 Volt Size 3 240 Volt Size 4 208 Volt Size 4 240 Volt If one of these braising pans will be used with single...

Page 17: ...OM CFPC 17 Wiring Diagrams...

Page 18: ...OM CFPC 18 Wiring Diagrams...

Page 19: ...OM CFPC 19 Wiring Diagrams...

Page 20: ...OM CFPC 20 Wiring Diagrams...

Page 21: ...OM CFPC 21 Wiring Diagrams...

Page 22: ...OM CFPC 22 Wiring Diagrams...

Page 23: ...OM CFPC 23 Wiring Diagrams...

Page 24: ...NATIONAL SANITATION FOUNDATION 3475 Plymouth Rd Ann Arbor Michigan 48106 UNDERWRITERS LABORATORIES INC NATIONAL FIRE PROTECTION ASSOCIATION 60 Battery March Park Quincy Massachusetts 02269 NFPA The N...

Page 25: ...______ Serial No ______________________________ Location ________________________________ Date Purchased _________________________ Date Installed ___________________________ Purchase Order No ________...

Page 26: ...portal transportation costs time mileage for the first twelve 12 months from date of installation or fifteen 15 months from date of shipment from Groen IV This warranty does not cover boiler maintena...

Page 27: ...OM CFPC 27 NOTES...

Page 28: ...1055 Mendell Davis Drive Jackson MS 39212 Telephone 601 372 3903 OM CFPC Revised 10 98 FAX 601 373 9587 Part Number 121028...

Reviews: