Model G0634Z/G0634XP (Mfd. Since 01/20)
-23-
Lifting & Placing
HEAVY LIFT!
Straining or crushing injury
may occur from improperly
lifting machine or some of
its parts. To reduce this risk,
get help from other people
and use a forklift (or other
lifting equipment) rated for
weight of this machine.
Unbolt the jointer/planer from the pallet, and use a
forklift to lift the machine off the pallet and onto a
suitable location as shown in
Figure 18
. Only lift
the machine enough to clear the floor.
Figure 18.
Example of lifting Model G0634Z/
G0634XP with forklift.
You can also attach hooks and lifting slings to
the machine using the three lifting holes shown
in
Figures 19 & 20
with a forklift, hoist, or boom
crane. If you choose this alternative, you must
punch out the lifting strap holes—this will perma-
nently alter your machine.
If you are unsure how to lift this machine, consult
a qualified professional.
After setting the machine in place, remove the
shipping braces on both sides (see
Figure 19
).
Figure 20
. Location of left rear lifting hole.
Figure 19
. Locations of front and right rear lifting
holes and shipping braces.
Shipping
Braces
Summary of Contents for G0634Z insert
Page 92: ......