background image

G e t t i n g   S t a r t e d  

P o w e r N o d e s   U s e r   G u i d e  

|   8

 

 

5. 

During this process, verify that the Gateway activity indicator still displays a clockwise rotating 
pattern. If not, then the Gateway is not in inclusion mode and you must return to step 3. 

After a few seconds, the rotating pattern on both the PowerNode and the Gateway stops. All bars 
turn green forming a circle for several seconds. This indicates a successful inclusion. 

 

If all bars on the activity indicator start flashing instead of forming a solid circle, then the 
PowerNode inclusion process has failed, and you must start the sync process again. If syncing 
continually fails even though the PowerNode is close to the Gateway, then it may be an indication 
of a hardware fault, and the PowerNode might need replacing. 

6. 

After you confirm the PowerNode is connected to the Gateway, move the PowerNode to the 
location where you will plug in your devices. When you unplug the PowerNode to move it, the 
PowerNode remains synced to the Gateway. 

Step 4: Add Devices to the PowerNode 

You can add your devices to the PowerNode, then add the devices to your online account. If you are 
installing more than one PowerNode, you can wait until all PowerNodes are installed to add the devices 
to your online account at the same time. 

Note:

 

PowerNodes and Gateway that are components of an energy management kit are synced prior to shipping. 

If the PowerNodes is not a component of an energy management kit, then you must first sync it with your Gateway. 
For additional information, refer to 

Sync the PowerNode with Gateway if Not Part of a Kit

 section in the 

Advanced 

Z-Wave Tasks

 chapter.  

Perform the following steps: 

1. 

Turn the device off, unplug it from any power source, and then plug it into the PowerNode port.  

2. 

Turn the PowerNode on by pressing the power button. The power button illuminates white to 
indicate the power is on. 

 

3. 

Turn the devices on. They are now part of your energy management system.  

Step 5: Add Connected Devices to Your Online Account 

You must set up your devices in your online account to be able to control and monitor them remotely. 

Summary of Contents for Multi-Port PowerNode

Page 1: ...P o w e r N o d e s U s e r G u i d e i PowerNodes User Guide...

Page 2: ...Devices to the PowerNode 8 Step 5 Add Connected Devices to Your Online Account 8 Managing PowerNodes 10 Add or Change Devices Connected to PowerNode 10 Move PowerNode to a Different Room or Change the...

Page 3: ...tely through a Web browser or smart device application PowerNodes are available with a one port or multi port configuration PowerNodes automatically connect to your Gateway enabling the Gateway to sec...

Page 4: ...owerNode Port Outlet where you plug your device Room Color Selector Specifies the room color associated with the PowerNode Reset Button Resets the PowerNode to factory default settings Activity Indica...

Page 5: ...erNode Ports Outlets where you plug your devices Room Color Selector Specifies the room color associated with the PowerNode Activity Indicator and Power Button Displays status of the connection to the...

Page 6: ...t of range You can move the PowerNode closer to the Gateway or add additional PowerNodes closer to the Gateway The PowerNodes can piggyback on each other s network connection Two green bars rotating c...

Page 7: ...loss of power such as a PowerNode being powered off may cause temporary or permanent damage to such devices We recommend you refer to the manufacturer s instructions before deciding if and how to use...

Page 8: ...nt rooms to various colors making those rooms easy to identify when managing your power sources If you use more than one PowerNode in the same room you can set them to the same color Then when you acc...

Page 9: ...strong radio signal If you will be syncing more than one PowerNode start with the PowerNode that will be located closest to the Gateway when the devices are plugged in That way its wireless connection...

Page 10: ...to move it the PowerNode remains synced to the Gateway Step 4 Add Devices to the PowerNode You can add your devices to the PowerNode then add the devices to your online account If you are installing m...

Page 11: ...can also access online help for additional information and instructions on working with the Web application 2 Click the My Settings menu 3 When the Settings page opens click the Set Up Wizard option i...

Page 12: ...u 3 On the carousel select the room card and then click the room icon for the room containing the PowerNode 4 Click the icon for the port where you plugged in the new device If you are replacing an ol...

Page 13: ...improve reception When you move a PowerNode you must have the Gateway re establish its radio signals with the PowerNodes on your energy management system Re establish the Gateway s Radio Signal When...

Page 14: ...the other network removed before you can connect it to your energy management system This process is called exclusion and requires you to perform steps with both the Gateway and the PowerNode To compl...

Page 15: ...teway is not in exclusion mode and you must repeat step 3 After a few seconds the rotating pattern on both the PowerNode and the Gateway stops and all bars turn green forming a circle for several seco...

Page 16: ...ause interference with the radio signals If the Gateway is positioned vertically such as attached to the wall the radio signal strength could be reduced If the Gateway is behind a metal object the rad...

Page 17: ...e affixed label indicates that you must not discard this electrical electronic product in domestic household waste WEEE Product Category With reference to the equipment types in the WEEE Directive Ann...

Page 18: ...as irons space heaters and power tools should never be left unattended and should never be left in the on position unless you are actively using the device Hazardous if power is interrupted Certain de...

Page 19: ...ild deploy and manage connected appliances and services that both improve efficiency and enhance productivity Learn more about GreenWave at www GreenWaveReality com or follow us on Twitter at GrnWaveR...

Page 20: ...ght DeviceDNA v1 0 Power For power levels in specific regions refer to the Specifications by Region section Power Rated 120V 240V 50 60Hz Maximum Load Current 15A Standby Power 1W Load Monitoring Prec...

Page 21: ...6 port NP24x I 6 port NP21x KF 6 port NP31x F 5 port NP21x G 6 port NP22x B Socket Type Type I TypeC and K Type F Type G Type B Plug Type AS NZS 3112 CEE 7 17 and CEE7 7 DIN49441 BS1363 1 NEMA 5 15P V...

Page 22: ...or relocate the receiving antenna Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit different from that to which the receiver is connected Co...

Reviews: