.
www.greenlife.de
50
Connections
The inflow and ventilation are cut and connected
via cross-cut . The inflow pipe and the ventilation
are pushed into it about 15-20 cm. If necessary the
pipe can be attached by means of PVC adhesive.
The ventilation can be installed above or the side of
the percolation cubes. For the lateral variation, a
90° arc KG is also required.
Backfilling
The backfilling required all pipes are connected in
the pit. Please pay attention that any foreign objects
such as stones and / or similar items are removed.
The geotextile must remain intact and the overlap
even when filling continue to be ensured. Note
during backfilling that the complete infiltration a
gravel layer must be about 10 to 20 cm. From top of
the infiltration of the discharged excavation material
can be used. However, make sure that no stones or
other sharp objects damage the geotextile. Fill in 20
cm steps and compress respectively until the pit is
full.
installation manual
Percolation cube 205 l
installation Percolation cube:
Stand: 07/16
Subject to technical changes
We shall not be liable for printing errors.
Technical support via:
phone: +49 (0) 385 7733 775
E-Mail: [email protected]