5. Mounting example
3 percolation cubes
incl. ventilation and
geotextile. Geotextile
covered
ventilation
DN 110
inflow
DN 110/150
.
Assembly manual:
www.greenlife.de
1. Breaking of the pins
(24 pieces )
suitable is a side cutter
3. Cutting of inflow / ventilation
cut / saw the inflow and if
required ventilation.
For this purpose use a small
saw blade.
Depending on the demand cut /
saw DN110 or DN 150.
2. Connecting of the pins
Each side plate is connected
to 8 pins. If pressing by hand is
not working by hand, using a
small hammer.
1.
2.
3.
4.
4. Total view
Assembly
5.
installation manual
Percolation cube 205 l
Technical support via:
phone: +49 (0) 385 7733 775
E-Mail: [email protected]
Stand: 07/16
Subject to technical changes
We shall not be liable for printing errors.