GREE hotovoltaic Multi VRF for North America
129
Removal operation of compressor
Remark: Before removing the compressor, please make sure that there’s no refrigerant inside the pipeline and the
power is disconnected.
Process
Photo
Operation Instruction
3) Loose nuts
fixing the foot of
compressor
Twist off the nuts for
compressor with
wrench
4)Remove the
chassis from
compressor
● Take out the
compressor and
replace it
Note: When
replacing the
compressor, do not
damage nearby
pipelines and other
parts
Summary of Contents for GMV-Y36WL/A-T
Page 1: ...Photovoltaic Multi VRF for North America Capacity 36 kBtu h 60 kBtu h Rated Frequency 60 Hz...
Page 3: ...GREE Photovoltaic Multi VRF for North America 1 PRODUCT...
Page 15: ...GREE Photovoltaic Multi VRF for North America 13 CONTROL...
Page 18: ...GREE Photovoltaic Multi VRF for North America 16 2 Wired Controller 2 1 Control panel...
Page 19: ...GREE Photovoltaic Multi VRF for North America 17...
Page 20: ...GREE Photovoltaic Multi VRF for North America 18 Button Graphics...
Page 28: ...GREE Photovoltaic Multi VRF for North America 26 4 3 2 2 Appearance...
Page 34: ...GREE Photovoltaic Multi VRF for North America 32 Installation is in progress...
Page 37: ...GREE Photovoltaic Multi VRF for North America 35 Installation is in progress...
Page 39: ...GREE Photovoltaic Multi VRF for North America 37 Click Next...
Page 57: ...GREE Photovoltaic Multi VRF for North America 55...
Page 69: ...GREE Photovoltaic Multi VRF for North America 67 Switchover of Software Languages...
Page 70: ...GREE hotovoltaic Multi VRF for North America 68 INSTALLATION...
Page 102: ...GREE hotovoltaic Multi VRF for North America 100 MAINTENANCE...
Page 147: ...JF00303833...