GREE Photovoltaic Multi VRF for North America
14
CONTROL
1
Units’ Control
1.1 Schematic
diagram of units’ control
1.2 Interpretation on the schematic diagram
1)
High pressure switch is used to identify system’s high and low pressure. When
pressure is too high, the switch will break off and send a signal to main board.
Main board will pass this signal to controller, where the error will be displayed, and
stop unit from working.
2)
High/low pressure sensor is used to test unit’s high/low pressure and send
real-
time data to controller, which will control each unit’s output according to the
control logic.
3) Temperature sensors are used to test the tube temperature of the unit and send
data to the controller, which will control each uni
t’s output according to the control
logic.
Summary of Contents for GMV-Y36WL/A-T
Page 1: ...Photovoltaic Multi VRF for North America Capacity 36 kBtu h 60 kBtu h Rated Frequency 60 Hz...
Page 3: ...GREE Photovoltaic Multi VRF for North America 1 PRODUCT...
Page 15: ...GREE Photovoltaic Multi VRF for North America 13 CONTROL...
Page 18: ...GREE Photovoltaic Multi VRF for North America 16 2 Wired Controller 2 1 Control panel...
Page 19: ...GREE Photovoltaic Multi VRF for North America 17...
Page 20: ...GREE Photovoltaic Multi VRF for North America 18 Button Graphics...
Page 28: ...GREE Photovoltaic Multi VRF for North America 26 4 3 2 2 Appearance...
Page 34: ...GREE Photovoltaic Multi VRF for North America 32 Installation is in progress...
Page 37: ...GREE Photovoltaic Multi VRF for North America 35 Installation is in progress...
Page 39: ...GREE Photovoltaic Multi VRF for North America 37 Click Next...
Page 57: ...GREE Photovoltaic Multi VRF for North America 55...
Page 69: ...GREE Photovoltaic Multi VRF for North America 67 Switchover of Software Languages...
Page 70: ...GREE hotovoltaic Multi VRF for North America 68 INSTALLATION...
Page 102: ...GREE hotovoltaic Multi VRF for North America 100 MAINTENANCE...
Page 147: ...JF00303833...