![GREAT PLAINS Yield-Pro YP4025A-48TR20 Operator'S Manual Download Page 52](http://html1.mh-extra.com/html/great-plains/yield-pro-yp4025a-48tr20/yield-pro-yp4025a-48tr20_operators-manual_2259532052.webp)
2019-03-19
411-198M
YP4025A-48TR20
Operating Instructions
48
Steps for setting and adjusting the air system are found
at “
Y-Tubes
Y-tube gates can be shut off to feed only one row for
single-row planting on a twin-row machine. In the
photograph, the left meter tube is open and the right
closed.
You can also shut off the Y-tube gates to clean out the air
system and meters. See “
Airbox Operation
The function of the airbox
is to mix seed with turbulent
air from the hydraulic fan, which then exits through a
manifold (not shown) to the seed tubes which serve the
row unit meters.
Before the first planting each season, or when using
new meters or meter wheels for the first time, or at the
start of each season, before filling with seed, add
1
/
3
cup (80 ml) seed lubricant to bottom of airbox.
When starting empty you must blow seed out to the
meters for two to four minutes to fill meters.
The monitor has a level sensor below the hopper or seed
box to warn when seed box is empty. There are three to
four acres of seed in the system when the sensor first
indicates box empty, depending on seeding rate.
Figure 46
Seed Y-Tube
29758
Figure 47
Air Box
29309
1