![GREAT PLAINS Yield-Pro Air-Pro YP2425A Operator'S Manual Download Page 38](http://html1.mh-extra.com/html/great-plains/yield-pro-air-pro-yp2425a/yield-pro-air-pro-yp2425a_operators-manual_2259528038.webp)
Great Plains
| 401-626M | 2019-06-11
34
YP2425A
Operating Instructions
Transport Checklist
If heading to the field, before departing, ensure that
opener depth, seed rate and fertilizer rate have been
determined, or that the necessary data is with you.
Plan the route. If towing a cart hitched to the planter,
plan the route so that no reverse movements will be
necessary. Avoid steep hills. Keep clearances in
mind. Folded, your planter may be nearly
15 feet (4.6 m) wide and 13 feet (4 m) high.
Close slide gates on hoppers or seed boxes.
Hitch.
Make both electrical and hydraulic connections. See
hydraulic hitch, check that safety chain is anchored.
If markers are unfolded, fold them.
Raise planter.
Install lock-up channels on lift cylinders.
If planter wings are unfolded, fold them.
Make sure wing locks are engaged.
Make sure caster locks are disengaged. See
3-point hitch:
Lower hitch fully to ensure wings remain locked.
Hydraulic hitch:
Confirm CFM set to Hitch and hitch circuit in Float.
Check all lights. Always have lights on for highway
operation.
Comply with all national, regional and local safety
laws when traveling on public roads.
Travel with caution.
Summary of Contents for Yield-Pro Air-Pro YP2425A
Page 172: ...Table of Contents Index Table of Contents Index...
Page 178: ...Great Plains 401 626M 2019 06 11 Table of Contents Index 174 YP2425A Table of Contents Index...
Page 179: ...Table of Contents Index Table of Contents Index...
Page 180: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 Table of Contents Index...