3S-3000
Assembly
19
4/25/19
195-144M
Open Center Conversion
If the drill was shipped with an Open Center kit, it is not
factory-installed. Install it now. An installation manual is
provided.
Point Row Option
If the Point Row Option was ordered with the drill, the
hydraulics and drill electrical lead are factory-installed.
If the customer’s primary tractor is available, install the
control module in the tractor cable and make the electrical
connection. Consult the Point Row installation manual
provided.
If the primary tractor is not available, temporarily connect
the control module so that openers can be operated
during Setup.
Post Assembly Checklist
Check that all working parts are moving freely, bolts
are tight, and cotter pins are spread.
Check for proper tension and alignment on all drive
chains.
Check that all safety decals and reflectors are located
correctly and are legible. Replace if improperly
located or damaged. Refer to “
Safety Decals
” in the
Operator’s manual.
Inflate tires to recommended pressures as listed on
the
“Tire Inflation Chart”
in the Operator’s Manual.
Tighten wheel bolts as specified on “
Figure 20
Open Center Conversion
18750
Figure 21
Point-Row Connector
26469
Summary of Contents for 3S-3000 Series
Page 2: ...Table of Contents Table of Contents ...
Page 4: ...4 25 19 Table of Contents 195 144M 3S 3000 Table of Contents iv ...
Page 47: ...3S 3000 Table of Contents Appendix 43 4 25 19 Table of Contents 195 144M Point Row 22969 ...
Page 48: ...4 25 19 Table of Contents 195 144M 3S 3000 Table of Contents Appendix 44 ...
Page 49: ...Table of Contents Table of Contents ...
Page 50: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 ...