4/25/19
195-144M
3S-3000
8
Assembly
Position for Assembly
1.
Unload mainframe (standard load) or drill (wide load)
from truck and place it in a location that allows for:
•
tow away depth:
28 feet (8.5m) plus
length of tractor plus
turning room
•
wing unfolding:
16 feet (4.9m) either side of centerline, or
32 feet (9.8m) total span), and
•
if markers were ordered:
32 feet (9.8m) either side of centerline, or
64 feet (19.5m) total span.
If the drill was shipped as a Wide Load, skip to “
Assemble Tongue to Mainframe
When space is available on the trailer, the tongue is
factory-assembled, in which case skip to “
2.
Block the mainframe assembly (1) up in the raised
position with the transport cylinders extended and
the cylinder lock channels (2) over the cylinder rods.
3.
With the aid of a fork-lift, hoist, or loader, position the
tongue assembly (3) back under the mainframe
assembly (1) and bolt it into place with the twelve
1 x 2
3
4
-inch bolts (4), flat washers (5), lock washers
(6) and nuts (7).
Lightly tighten all 1-inch bolts before torquing any of
them.
4.
Once the tongue is assembled, remove the cylinder
lock channels (2), completely lower the mainframe
assembly and secure it in this position.
5.
Route the two long
3
8
-inch hydraulic hoses (8) from
the back of the tongue tube along the right side of
the main frame and connect them to the
9
16
-inch
bulkhead tees (9) on the front of the main frame.
6.
Route the two long
1
4
-inch hoses (10) coming out of
the back of the tongue to the
9
16
-inch tees (11) on
the rod and base ends of the right fold cylinder.
The fold circuit hoses (10) run the full length of the
tongue.
7.
Secure the hoses (8) and (10) with a hose clamp
bracket (12) and
5
16
x 2
1
4
-inch bolts (13) and lock
washers (14).
Use rubber hydraulic hose guards (15) on the
1
4
-inch hydraulic hoses.
8.
Route the long
1
4
-inch hose (16) coming from the
base end of box lift cylinder at the center of the
tongue to the
9
16
-inch base end tee (17) at the right
transport lift cylinder on the transport axle.
9.
Route the long
1
4
-inch hose (18) coming from the
rod end of box lift cylinder at the center of the tongue
to the
9
16
-inch rod end tee (19) at the right transport
lift cylinder on the transport axle.
Summary of Contents for 3S-3000 Series
Page 2: ...Table of Contents Table of Contents ...
Page 4: ...4 25 19 Table of Contents 195 144M 3S 3000 Table of Contents iv ...
Page 47: ...3S 3000 Table of Contents Appendix 43 4 25 19 Table of Contents 195 144M Point Row 22969 ...
Page 48: ...4 25 19 Table of Contents 195 144M 3S 3000 Table of Contents Appendix 44 ...
Page 49: ...Table of Contents Table of Contents ...
Page 50: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 ...