3S-3000
Setup
29
4/25/19
195-144M
Leveling the Drill
To perform leveling, the drill must be hitched to a tractor,
with at least the hydraulics connected.
Raising openers on unfolded, unhitched drill will cause drill
tongue to rise suddenly, which could cause serious injury or
death. Be certain that drill is hitched securely to your tractor
drawbar and the safety chain is securely attached to tractor
before raising openers and unfolding drill.
Center Box Frame Leveling
1.
Park the drill on a clean level surface.
2.
Raise the openers and lock them up. See Operator’s
Manual for opener lift and lock instructions.
Refer to Figure 34
(bolts, nuts and washers shown removed for clarity -
loosen, but do not remove them).
3.
Loosen the eight center box mount bolts (1), four
bolts on each side of tongue and slide center box
frame sideways until it is centered with mainframe
and transport axle.
Refer to Figure 35 and Figure 34
4.
Measure the height of center box opener frame
pivots (2) from the level surface and raise low end of
box frame up until both opener frame pivots
measure the same distance from the ground.
5.
Tighten the
7
8
x 2
3
4
-inch box mount bolts (1) to
torque specified in “
Opener Frames Level
Check that opener frames are level across drill. When
fully raised, top of opener mounts should clear bottom of
drill frame tube by at least
1
2
inch (1.3cm).
Figure 34
Center Box Mount Bolts
26498
1
Figure 35
Opener Frame Pivot Height
18874
2
Summary of Contents for 3S-3000 Series
Page 2: ...Table of Contents Table of Contents ...
Page 4: ...4 25 19 Table of Contents 195 144M 3S 3000 Table of Contents iv ...
Page 47: ...3S 3000 Table of Contents Appendix 43 4 25 19 Table of Contents 195 144M Point Row 22969 ...
Page 48: ...4 25 19 Table of Contents 195 144M 3S 3000 Table of Contents Appendix 44 ...
Page 49: ...Table of Contents Table of Contents ...
Page 50: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 ...