2SF24 and 2SF30
Preparation and Setup
23
2018-08-02
155-015M-A
Drill Adjustments
Put the transport pins in storage position. Slowly lower
the drill until it is on the ground and the main frame top
slide cylinder is fully extended. Pull the drill forward a few
feet to make sure that the transport and the gauge wheel
tires have equally firm contact with the soil.
Unfold the drill on a level seedbed typical to your soil
conditions.
At the top of both vertical tubes on the transport frame is
a threaded stud and jam nut. Make sure both studs have
approximately the same length of threads extending
above the jam nut (approximately 3 inches for most
planting conditions). Adjustments may be required.
Figure 14
Top Slide Cylinder
10671
Figure 15
Threaded Stud
10672