![GREAT PLAINS 2SF24 Operating Manual Download Page 76](http://html1.mh-extra.com/html/great-plains/2sf24/2sf24_operating-manual_2259415076.webp)
2018-08-02
155-015M-A
2SF24 and 2SF30
Appendix B - Assembly and Setup
72
Harness Installation (2SF24 S/N 3509F+) (2SF30 S/N 3974G+)
The red and amber lights should already be installed on
the machine. The enhanced module and machin
wishbone harness will need to be installed to connect the
lights.
Harness Damage Hazard:
Make sure all wiring harnesses are secured to the machine to
prevent damage to the harnesses which can result in injury to
the operator or damage to the machine.
Refer to Figure 49 and Figure 50 on the next page.
The main wiring harness (1) with 7-pin plug (2) will
already be installed inside the tongue.
1.
Install the enhanced module (3) to the rear of the
mainframe as shown. Secure with two 1/4-20 x 1 1/4
inch bolts (4) and flange nuts (5).
2.
Plug in the main wiring harness coming from the rear
of the tongue to the enhanced module.
3.
Connect the wishbone harness (6) to the other end
of the enhanced module. Make sure to position the
wishbone harness so it can be routed as follows:
•
The wires with green tape will be routed to the
right-hand side of the machine.
•
The wires with yellow tape will be routed to the
left-hand side of the machine.
4.
Route the wishbone harness to the red lights.
5.
Plug in the three pin connectors (7) to the red lights.
6.
Route the two pin wire lead (8) to the amber lights.
Some wire ties, connecting the two and three pin
wire leads, may need to be clipped off with side
cutters to route the two pin wire leads.
7.
Plug in the two pin connectors (9) to the amber
lights.
8.
Secure the wiring harness to the machine with
adhesive backed cord clips (10) and wire ties (11).
Wire Damage Risk:
Make sure all harnesses are secured to machine. To prevent
damage to harnesses, do not stretch wires and do not let wires
drag on the ground. Allow enough harness length for folding
and unfolding machine, and watch for any pinch points.
4
5
3
Figure 49
Install Enhanced Module
68420A