2-8
Section 2 —
Installation
Switcher Power-Up
Once you have completed setup, mounting, and cabling you can
apply power to the system and perform an operational check.
To power up and perform an operational check:
1.
Connect the AC line cord from switcher to an AC main.
1
At this point, Performer does a self-test.
NOTE:
Displays may be accelerated by pressing any of buttons 1
through 8 on the Performer front panel or skipped entirely by
pressing any other button.
Status information is displayed in the following order:
*Performer automatically adjusts itself to NTSC or PAL video
signals.
1. Due to the variation in styles, you must provide and install the
AC plug end for export units (PFR-240).
Start-up
Display
Protocol or Test
88 88 88
LED test
rE SE t
Warm reset
10 20
TEN-20 compatible
7 68 00
Baud rate
PA r n8
No parity / 8 data bits
SO 1- 10
No source offset
DE St 01
No destination offset
LV L1 23
No level offset
SL AV E0
Master mode
NT SC
NTSC video source*
Summary of Contents for PERFORMER
Page 8: ...viii Contents ...
Page 16: ...xiv Safeguards and Notices ...
Page 32: ...1 12 Section 1 Product Description ...
Page 118: ...2 86 Section 2 Installation ...
Page 178: ...3 60 Section 3 Operation Service ...